Laserfiche WebLink
• an approved landscape company. This contract should include one burn at the <br />end of 3 years. <br />• <br />A berm area on the western side of the project is intended to screen the <br />residential area to the west. This berm should be irrigated, in order to support <br />plantings on the berm. <br />In the tree planting pallet, Green Mountain Sugar maples should be changed. <br />Red maple, Hackberry, Red or White /Burr oaks should be substituted for the <br />Green Mountain maples. <br />On the upland portions of the pond areas that are to be seeded with the City <br />native seed mix, the developer should plant tree species that would tolerate <br />native plant management. I would suggest changing the Niobe Weeping Willows <br />to Oak species. <br />Apollo Court should have boulevard trees planted every 50 feet. Suggest <br />planting oaks in this area. <br />In the foundation planting schedule, I would suggest changing the Dwarf Amur <br />maple to some native species that is not on the state invasive listing. <br />Tree Preservation <br />Although there are several stamped trees on the plan that appear to be <br />significant trees, there is no identifying codes as to what these trees are, or <br />whether they are intended to be removed or saved. If they are to be saved they <br />should be indicated as such on the plan and a detail on appropriate tree <br />protection measures shown. All tree protection measures must be implemented <br />prior to soil disturbance. <br />Lighting <br />The photometric plan shows the Tight "zeroing -out" at the property line. <br />Attachment 12 shows the submitted security -light fixtures. These do not appear <br />to meet the City standard. <br />Erosion Control <br />The erosion control plan must be on site. The developer should indicate the <br />place where the erosion control plan under an approved NPDES permit will be <br />found on site. All required weekly and post rainfall event inspection reports must <br />be located with the erosion control plan. The developer should indicate the site <br />NPDES site supervisor and contact number. <br />110 Rock entrances must be replaced or added to if rock pore spaces become filled. <br />Any area storm water catch basins must be protected with an approved sediment <br />