Laserfiche WebLink
• <br />S T O R M W A T E R P O L L U T I O N PREVENTION k <br />Apply is and .Main of needed Mom ma permits hao• 51. appropriate doh. county and toed <br />goo mmentd agency. <br />---•I P01 ILK Pm.enl' Phu fSWPPPI The SWPPP includes this narrative, Nu Grading, <br />Utility, and Erasion Central Plan, and the DIE sheets. Keep a copy of the SWPPP, <br />all Moangwi 10 N, and inspections and maintenance records at 5w sae during the <br />construction. <br />ALL SILT rrNCE MUST BE INSTALLED SY THE CONTRACTOR AND INSPECTED ST <br />THE CITY PRIOR TO ANY SITE WORK. <br />CONTACT PROJECT MANAGe3 <br />HOLIDAY STATIONSTORES <br />4567 AMERICAN BLVD. <br />BLOOMINGTON. tai <br />e992- 550 -1SBM <br />F.r05iDn Control Notoo <br />Garotter Mall take mummy precaution. to prevent a6 and debris nun-off during grading <br />operations 6.e. .M fence, rock d&em, M4 Contractor .ha istd d erosion mad <br />measures prior to commenamant of any site grading. On a daily basis. Centres—Mr .hd <br />aped and mentor erosion control devices through au the .mar. conMrudon period mail <br />all comment. hove been installed and loed•cape are hove been sodded and stabRved. <br />M antra:tem shall remove .mum sell from time an a construction vehicles prior to <br />WaJng the construction .ate. All seamed en .troll mat be renewed by the responsible <br />contractors each day. <br />She Ihdl be re-vegetated main 46 Hare of rough and fled grading- .0. Land.aape Plan, <br />Sheet Lt, .hen provided a pal of eenlruelian document set. During extended gredbhp <br />operation mooed sass Mal be mated rah dean Mow mulch to prevent .dena sot <br />acs and *MP erosion <br />On .a. telpOr0ry .all s40R6105 If .hewn an NM Pon Sheet, are suggested areas. Any <br />ams.e ail Mall be trucked off Ms to seen as een.trudhn films. M sells removed (roe <br />elle shall be No ▪ management Stook manag piles shall be protected against era.kn from wind and <br />rater. <br />When at all p...aile, Contractor .51011 construct .tam retention/ erosion coma bestial prier <br />to iiti 1109 site work. All .tie moor Qom .Mod be Mooted into temporary basin* to <br />e liminate suspended coach IW, sack from Moving the eawruetion .re. <br />When permanent Ma*n eater basin are Designed for dm storm water many.nsnt, <br />Contrad.r.hat construe .arm retention basin a tired priority, before initiating overall <br />grading operations and the inedloran buildings or .der sic food re.. At lime of campaign <br />.f project, coeroetor shall excavate all widen' from the basin s reheat grod•s per plan <br />gDaZ Periodic maintenance or the .tam panda w6 be required during carsa'u 11001 The <br />inch rsneo ant be the responsibility t the contractor. <br />All leak areas Ma are to be molded shag be staked an .lap.. greater Math 5d, as wW m <br />in coinage .wales. Arco. to be seeded .halt be mulched inene6MMy spa seed applsaia. <br />Hydrostat.% wit m..d is acceptable provided 1oe each end ...d Malaial le reapplied In <br />diodrbed areas in o ..sty manner. Shedd hydra modelig not robin .oate In complex <br />drairog• area. and .rdma, contractor shell install fireus note air sod to mitre acceptable <br />vegebedve covers are In phas.. Note that .M f.n.s and rocked areas may roman In place <br />in problematic arum Cantrocter shall maintain seeded and sodded am* and awn arms <br />are fully established as stator Me for del' ieie ndaa afar each stem event. <br />-Contractor to respon.SNe for flushing are rema0ng w deposits from all eft Moron maim <br />when requested by ease er other moaaaPatgi.s and at lam of project earpietia. <br />-Refer to all ether project pas and kdantimn related to Ni. work <br />Vegetate Preservation Neter Corroder and evoke Best Management Practices to prevent <br />she km during prel.al. ematretsn Preserve mainly vegetation by initialing work some <br />that Malt Mr amunt a .M Nat M dskrbel during wieu0 phase. of M. protects �..• <br />CONSTRUCTION SEQUENCE <br />* INSTALL EROSION CONTROL <br />MEASURES <br />*INSTALL STORM SEWER <br />▪ INSTALL STRUCTURES <br />•INSTALL PAVEMENTS <br />* INSTALL LAWN/ LANDSCAPE <br />*FLUSH STORM SEWER <br />MUM EROSION CONTROL <br />MEASURES ONLY AFTER AU. <br />PAVEMENTS NAVE BEEN INSTALLED <br />AND ALL 5011.6 NAVE BEEN <br />STABILIZED <br />1 <br />s" <br />!:. <br />6 <br />• <br />05' .�5 ' <br />0 <br />6 <br /><NN1memo main-.- I J m - -- ..om• <br />iSMIIIIIVIIIIIIII*MIIIMOMIMIIIIM I <br />le illMilliMIEVMENIME WWI <br />a. ` a l,„ <br />; J • i <br />r, i t , t . t J I <br />— . -r - -- -- - - - -ri <br />bi P1 <br />it • <br />any -- -1 - _ I ! i $' if' <br />II <br />1E� . p - <br />IiI11I$ . <br />1 <br />aillitil <br />12 <br />f <br />A <br />CXISTING SITE CONDITIONS <br />ZONING DISTRICT: <br />TOT SITE AREA <br />AMoc hmeirle 8 <br />RECEIVED <br />.SAN 16 2 0w..../A-- <br />SI'T <br />CITY OF LNO <br />OS GENERAL BUSINESS <br />165,271 SP <br />15.615 SP <br />HOLIDAYY�5T TIONSTOR0 62,676 SP <br />;PROPOSED RETAIL: 66,567 5P <br />BUILDING SETBACKS <br />FROM STREET 50 <br />REAR YARD 50 <br />SIDE YARD 10 <br />*acrims.Lumeagmeason <br />51 <br />561 <br />561 <br />PARKINS SETBACKS <br />FROM STREET IN <br />REAR YARD 10 <br />SIDE YARD W <br />PROPOSED meets AREA <br />PROPOSED HARD COVER: <br />PAVED AREA <br />BUILDING AREA <br />C -STORE • <br />CAR WASH • <br />PARKING REOUII0GMENTS <br />PARKING REQUIRED 1/200 5F PA. <br />PARKING PROVIDED <br />jtAIL LOT PROPOSED CONDITIONS <br />PROPOSED GREEN AREA 50656 SP <br />PROPOSED HARD COVEk 25,641 SP <br />PAVED AREA: 22,4411 SP <br />5UIL.DING AREA 6500 SP <br />PARKING REQUIREMENTS <br />PARING REQUIRED 1/200 SF FAA <br />PARKING PROVIDED <br />40,700 SP <br />51,676 SP <br />46,456 SF <br />6545 5F <br />r <br />tai <br />! G <br />- w <br />N <br />O <br />z <br />1= <br />C <br />411 <br />O R -r H <br />00' <br />441 <br />561 <br />S01 <br />61 <br />25 STALLS <br />26 STALLS <br />511 <br />401 <br />551 <br />111 <br />26 STALLS <br />52 STALLS <br />bar IL a Me tb S•Itte 314 <br />alb, MI.....l. 514.7 <br />747 mere. r4 <br />W < <br />0 <br />O W <br />CO 2 <br />Z <br />Z y <br />O Y <br />J <br />O <br />I— Z <br />co J <br />ALL OIE0TID/5 IMAM TO <br />MOOING MD CONSTRUCTION Of <br />MM PROJECT MALL RE <br />Data= TO HOLIDAY <br />00IPANTI PRDiCT MAN IER <br />4M MOT 001 enterr <br />ONISM LIF. MM 004N <br />Mora IMO eto- <br />FAR NON 111104P7s <br />Z -J <br />c• •-6 <br />O Z -J <br />CC p a. <br />11J <br />hereby certify War this plan, <br />specification, or report was <br />prepared by me Or under my <br />Greet mlper*Oiay and that I am <br />a dilly Ikaree1 Laa.oeq. <br />ism*, O4. Web of Ina <br />Stole of Mk0100oto. <br />Nat 1006 <br />Robert .1. Mahe <br />NO. DATE 0EY1510N DESCRIPTION <br />0100101 1806 - em11a. Ole RAM* <br />DATE 00012/07 PRO1. 00. 2007 Ot <br />