Laserfiche WebLink
• <br />MODEM LATHE SHALL BE NAILED SECURELY <br />TO THE POST MEMBER 1O SECURE FLIER FABRIC. <br />rx4'x S LONG <br />POSTS. 6 REO'D. <br />2 x 4' HORIZONTAL MEMBERS CONTINUOUS <br />AROUND 1CP. FASTENED TO EACH POST USING <br />2 -200 COMMON NALS <br />SILT (GEO1EX10E) FENCE, <br />AS SPEOFIED. BOTTOM ... <br />C OF FABRIC TO BE <br />BURIED TO PREVENT <br />UNDERWAS -WIG. <br />3/4' CLEAR ROOK <br />1' DEEP x 1' wDE <br />CONTRACTOR TO SET POSTS AND FABRIC AROUND <br />THE BASIN DURING ME BACKFLUNG OPERATION. <br />SS Al D SHAPE OF INC BARRIER SHALL BE <br />11 05RD TO FIT STRUCTURE. SILT FENCE TO BE PLACED <br />AROUND DUAL PERIMETER. TOP K SILT FENCE TO HAVE <br />12' MN. CLEARENCE 10 Em5TNG GRADE. <br />STANDARD DETAILS <br />EROSION CONTROL AROUND <br />CATCH BASIN <br />SILT FENBISt1 CE <br />c <br />1 <br />pD <br />Pugy ayyes.� <br />H:Ry0 . •I. �j'�j6 . <br />' is SI. 5%���. f.4.. <br />Ve�w••_••e •ells <br />4i ��•r!f •' e 0'M <br />VA <br />q0 <br />6" MINIMUM DEPTH <br />- 2' WASHED ROCK <br />18' MINIMUM CUT OFF BERM <br />TO MINIMIZE RUNOFF FROM SITE <br />FILTER FABRIC SHALL BE PLACED UNDER ROCK <br />TO STOP MUD MIGRATION THROUGH ROCK <br />STANDARD DETAILS <br />ROCK CONSTRUCTION ENTRANCE <br />Overlap geotaxtlIe fabric <br />6" and fasten at 2' intervals <br />Mon <br />2- x 2' wood or steel <br />fence post. 6' max. spacing <br />Wire mesh reinforcement. Std. <br />field fence, min. 30' high. <br />max. mesh spacing 6- and <br />min. 14 1/ <br />2 wife <br />Ceetestle fabric — overlap fabric <br />6' and fasten at 2' intervals <br />Loy 5*brie in the trench <br />Fabric anchorage trench <br />MackIlil trench with <br />tamped natural soil <br />Extend wire mesh <br />into trench <br />Support in—situ soon or cement manor <br />as specified <br />6" <br />MIN. <br />Notr Attach fabric to <br />mire mesh and support posts <br />with rings or wire ties <br />1 <br />STANDARD DETAILS <br />SILT FENCE <br />HEAVY DUTY <br />STANDARD DETAILS <br />INLET PROTECTION <br />AROUND CATCH BASIN <br />RECEIVED <br />JAN 1 6 2007 <br />C[�YOFUNOlAI S <br />2' s 2' wood or steal fence post <br />5' maximum spacing <br />at <br />4' moxileam spoeirp <br />Gpetestile fabric — overlap fabric <br />6 and ie inn at tr intintervalintervals Loy fabric in the trench <br />211 � I sail <br />with <br />Support post anchorage <br />in —situ sal <br />6" <br />MIN. <br />Nate: Attach fabric to <br />support posts with <br />lath and stapies <br />STANDARD DETAILS <br />SILT FENCE <br />1 <br />ANCHOR TRENCH (SEE DETAIL <br />AND NOTES BELOW) <br />OVERLAP END JOINTS <br />MINIMUM OF 6' AND STAPLE <br />OVERLAP AT 1.5' INTERVALS <br />STAPLE DENSITY SHALL 85 A <br />MINIMUM OF 3 U— SHAPED 8'. <br />11 GAUGE METAL STAPLES PER <br />SOUARE YARD (THIS MAY VARY <br />AS DIRECTED BY THE OTY). <br />ANOlOR 1651401 <br />1. CNC 6' x 6' TRENCH <br />2. LAY BLANKET IN 'FRENCH <br />3. STAPLE AT 1.5' INTERVALS <br />4. BACKFILL 541H NATURAL SOIL AND COMPACT <br />5. BLANKET LENGTH SHALL NOT EXCEED 100' <br />111THOUT AN ANCHOR TRENCH <br />J <br />OVERLAP <br />LONGITUDINAL JOINTS <br />MINIMUM OF 6' <br />STANDARD DETAILS <br />EROSION CONTROL BLANKET <br />INSTALLATION <br />Av-1- ochrrert- cT <br />INSITES <br />viE NAMw1D N <br />Lan. EAMMIEG- <br />1021 N•r ►.r 1...e 50r11 . 5.1141.11 15 <br />•1r•••26. 1e.01. <br />/61.12*0 1.5400 <br />W <br />CC gal 0 <br />0/g) <br />Z <br />O Y <br />J <br />Q <br />[1— O <br />a Z <br />/ rj <br />ALL 4x1[57)005 RELATED 1a <br />MONO MD CONSTRUCTION OP <br />TIES PROJECT MALL OE <br />DIRECTED 10 HOLIDAY <br />CNPANri PROJECT MEAGER <br />4267 wear ROTE 61601 <br />IMt*raIA W *0407 <br />NMNS HTIM 1.104.44. <br />PAR INN 1135+070 <br />c <br />O <br />O L r._ <br />O O <br />L 0 <br />W U <br />NO. DATE REVISION DESCRIPTION <br />common 1000 - NMI* ene RAMSeO <br />DATE 01512/07 PR0.1 00. 2007 01 <br />