Laserfiche WebLink
• <br />• <br />• <br />gyp. <br />{ %26 J MARGARITA YEW <br />J <br />AUTUMN BRILLIANCE SERVICEBER <br />4 depth dreaded barb ,aad1 it <br />PignlnS area Pie filbr Eebrie <br />ergarae .auld.e. <br />p AUTUMN BRILLIANCE SERVICEB <br />l <br />LA NORTHERN PIN OAK <br />III ■ iIEESE ® WSW <br />(5 l O O ® f <br />4 r --a.l ..." --.. !rte <br />111111111111111111•1111•1511141M1101111•1111111 l■ <br />■u•••••• i"•••■ OIIII• <br />UJ <br />G <br />LJ <br />hEMERALD TRIUNP <br />depth shredded berm mulch In <br />plO1ab'B area. No Mr fabric under' <br />*yank molded P7Nb 'Mee <br />penmen ban and fed <br />NOTES: <br />RECEIVED <br />JAN 15 2007 <br />CITY OF LINO LAKE <br />- CONTRACTOR SHALL OBTAIN ALL NDCESSARY PERMITS FOR PLANTING WORK <br />LANDSCAPE CONTRACTOR SMALL VERIFY ALL UTILITIES WHICH MAT EFFECT HIS WORK <br />CONTACT GOPHER STATE ONE CALL / 454-0002 PDR EXACT LOCATIONS. <br />- LANDSCAPE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHERS AT SITE AND <br />COMPLETE HIS WORK PER OWNERS CONSTRUCTION SCNEOULE. <br />• ALL PLANT MATERIALS SHALL 6E GUARANTEED ONE N FULL TEAR UPON TOTAL COMPLETION <br />AND ACCEPTANCE NT OWNER WITH ONE TIME REPLACEMENT AT APPROPRIATE TIME OR UPON <br />REQUEST OF OWNER <br />- REPLACEMENT TOPSOIL SHALL PE CLEAN, FREE OF STONES, WEEDS, AND OTHER <br />UNDESIRABLE DEBRIS. <br />• PLANTING SOIL MIX (INCIDENTAL COST ITEM( <br />L MIX 1 US. 5-20-10 COMMERCIAL FERTILIZER PER CU. YD. TOPSOIL <br />2. THOROUGHLY MIX 1-PART SAID AND 1-PART PEAT MOSS WITH 5 -PARTS PeRT1LIZER AND <br />TOPSOIL <br />- use PLANTING SOIL AT ALL LOCATIONS PER DETAILS THIS 8NE0T. <br />• TOP SOIL SMALL BE A MINIMUM OF 4• DEPTH. LANDSCAPE CONTRACTOR SMALL VERIFY <br />TOPSOIL DEPTH AND NOTIPT OWNER OF ANT DEFICIENCY. <br />- SOD SHALL BE CULTURED WITH PREDOMINATELY KENTUCKY BLUEGRASS SEED OF RECENT <br />DISEASE RESISTANT INTRODUCTIONS. NO GUARANTEE ON SOD EXCEPT ANT SOD NOT <br />SATISFACTORY AT TOR: OF COMPLETION INSPECTION SHALL BE PROMPTLY REPLACED PRIOR <br />TO COMPLETION OF JOG STAKE SOD ON SLOP!! 5t1 AND GREATER <br />- smite MISTING CONCRETE/ ASPHALT AREAS ARE TO BE REPLACED WITH LANDSCAPING. <br />PROVISIONS SHOULD BE TAKEN TO COORDINATE EXCAVATION OF SUBSOIL TO A DEPTH OF 2' <br />CORN GRADING CONTRACTOR REPLACE WITH 4' COMPACTED TOPSOIL. ALL AREAS TO BE <br />LANDSCAPED AND SODDED SHALL BE GRADED 5440078 AND EVER <br />• LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR SODDING ALL AREAS WHICH ARE DISTURBED <br />NT CONSTRUCTION INCLUDING ALL R.O.W. AND ADJACENT PROPERTIES. <br />LANDSCAPE CONTRACTOR TO INSTALL VALLEY VIEW, 'SLACK DIAMOIO" EDGING AROUND ALL <br />PLANTING BEDS AS NOTED ON THIS PLAN. <br />- USE SHREDDED HARDWOOD DARK MULCH INSTALL M DEPTH. NO FILTER FABRIC OR <br />EDGING AROUND ALL TREES LOCATED OUTSIDE SHRUB BEDS. <br />• GRAVEL MULCH SHALL BE 1-1/2' DM 'RYAN RED ROCK. INSTALL 4' DEPTH WITH APPROVED <br />went FABRIC BARRIER AS INDICATED ON THIS PLAN. <br />LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR IRRIGATION SYSTEM DESIGN AND <br />INSTALLATION PER CITY LANDSCAPE SPECIFICATIONS. DESIGN SHALL BE APPROVED NT <br />OWNER PRIOR TO INSTALLATION. IRRIGATION DESIGN SHOULD ENCOMPASS ALL LANDSCAPE <br />AREAS WITH SOD AND/ OR PLANTINGS, PROM CURB TO CURE. RAW. SHOULD DE IRRIGATED <br />FROM SPRINKLER HEADS LOCATED vanes PROPERTY BOUNDARY. CARE SHOULD BE TAKEN IN <br />VICINITT OF ALL WALKS AND DRIVES TO NINON= OVER SPRAT. IRRIGATION INSTALLATION <br />SHALL NOT INTERFERE WITH CITT WALKS AND TRAILS. COORDINATE INSTALLATION OF ALL <br />PVC 5LE!V! UNDER DRIVE AREAS WITH GENERAL CONTRACTOR IRRIGATION CONTRACTOR <br />SHALL MEET WITH PUBLIC WORKS PRIOR TO INSTALLATION. <br />- IRRIGATION SHALL D! INSTALLED PER cars IRRIGATION POLICY. <br />= IRRIGATION SHALL 5E REQUIRED TO NAVE RAIN SENSORS. <br />LANDSCAPE CONTRACTOR SHALL CLEAN ALL PAVEMENT AREAS AFTER ALL LANDSCAPE <br />INSTALLATION I5 COMPLETE AND ACCEPTED NT OWNER GENERAL CONTRACTOR TO SWEEP <br />PAVEMENT AREAS PRIOR TO TURN OVER TO OWNER <br />LANDSCAPE CONTRACTOR TO Seep DISTURBED AREAS AS NOTED WITH MN DOT GRASS MIX <br />500. SEED Pee MN DOT De510N SECTION 5576 <br />VIBURNII <br />t\' <br />\\ <br />;/ \ \ \\ <br />V"\ �. / • / <br />/ - <br />NORTHERN PIN OAK <br />8 I EMERALD TRIUMPH VIBURNUM <br />MI BLUEBERRY DELIGHT JUNIPER <br />TREE PLANTING DETAIL <br />NOT TO SCALE <br />acv° `* 10 <br />SITES <br />AM MANIOC WfCAMAICIe1ELRRE• <br />1015 11••ber Lana Meath . Sella 114 <br />P17eea lb. 4- 1 1 t• 1+147 <br />7WE i.81lel a <br />PLANT MATERIAL <br />ONTY. SIZE ROOT COMMON NAME <br />TYPE BOTANICAL NAME <br />4 <br />2.Y CAL <br />MI5 <br />PIN OAK <br />Quorsue .lhpeaidoli$ <br />4 <br />10' NT. <br />CLUMP <br />DiD <br />AUTUMN BRILLIANCE SERVICEBERRY <br />AnWaneller x grandirloro 'Autumn Brilliance' <br />26 <br />24• SPR <br />POT <br />MARGARITA YEW <br />Tams media x 'Margarita' <br />78 <br />24• SPR <br />POT <br />BLUEBERRY DEUGNT JUNIPER <br />Junperue cummunia deprdna° 'AniOak' <br />21 <br />>e HT. <br />POT <br />EMERALD TRDJMPH VIBURNUM <br />Viburnum x enmreld Triumph' <br />NOTE: PLANT SELECTIONS BASED ON ZONE, ENVIROMENT, AND CONDITION HARDINESS. <br />SALT TOLERANCE LEVELS ARE MODERATE TO GOOD RASED ON INFORMATION PROVIDED IN <br />TEXT 'DIRKS HARDT TREES AND SHRUBS" NT MICHAEL A. DIRK AND THROUGH LOCAL <br />NURSERY WHOLESALE LISTINGS. <br />MAC. <br />I SOO, EDGING, PLANTING SOIL, GRAVEL MULCH, PILTER FABRIC <br />