Laserfiche WebLink
• <br />• <br />(e) For a site or part of a site characterized by HSG C or D soils, <br />the stormWater management plan shall focus on incorporation of <br />water quality BMPs. The order of preference for BMP's is <br />biofiltration, filtration, wetland treatment system, extended <br />detention basin, NURP ponding. <br />(f) The runoff volume infiltration/detention standard of paragraph <br />(b) is modified for public linear (roadway, sidewalk and trail) <br />projects as follows. <br />Type of Construction <br />Standard <br />Hydrologic Soil Group <br />New _.4,0 acre <br />No change. <br />impervious <br />New < 1.0 acre <br />BMPs must be sized for the runoff <br />if • - 11.11 <br />Rural to Urban Section <br />volume generated from impervious <br />surface within the contributing area <br />n <br />Expansion/ <br />by an 0.8-inch event. <br />— Reconstruction <br />11- 1 Ile 1■U Ill ■:. - II <br />Mill & Overlay , <br />No permit required. <br />(iii) Peak Stormwater Runoff Control Stormwater runoff rates for the <br />proposed project must not exceed runoff rates for the critical two-year and <br />100-year frequency events. For those site areas not covered by hard <br />surface in the pre-existing condition, runoff rates are to be determined for <br />the pre-settlement condition. The following curve numbers shall be <br />utilized for pre-settlement condition modeling: <br />Curve Number for Use with Pre-Settlement Conditions <br />Hydrologic Soil Group <br />Runoff Curve Number* <br />A <br />3__Q <br />B <br />58 <br />c <br />n <br />D <br />11- 1 Ile 1■U Ill ■:. - II <br />- It's"- — <br />(iv) Bounce and Inundation Period. The project must meet hydroperiod <br />standards adapted from "Stormwater and Wetlands Planning and <br />Evaluation Guidelines for Addressing Potential Impacts of Urban <br />Stormwater and Snowmeit Runoff on Wetlands," (Minnesota Stormwater <br />Advisory Group, June 1997), as follows: <br />La keNVetla nd <br />Susceptibility Class <br />Highly susceptible <br />inundation Period <br />Permitted Bounce ft Two-Year event <br />Pre-development <br />Existing <br />Inundation Period <br />for 10-Year or <br />Greater Event <br />Existing <br />DRAFT DOCUMENT <br />15 <br />