My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/25/2007 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2007
>
07/25/2007 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 1:07:39 PM
Creation date
8/7/2014 9:23:38 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/25/2007
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wetland <br />Moderately <br />susceptible <br />Pre - development + <br />0.5 feet <br />Existing plus 1 day Existing plus 2 <br />days <br />Slightly susceptible Pre - development + <br />wetland 1.0 feet <br />Existing plus 2 days Existing plus 14 <br />days <br />Least - susceptible <br />wetland /Lake <br />No limit <br />Existing plus 7 days Existing plus 21 <br />days <br />(c) Design Criteria. <br />(i) Infiltration BMPs must be designed to provide: <br />(a) Adequate pretreatment measures before <br />discharge of runoff to the primary infiltration area <br />(b) Drawdown within 48 -hours from the end of a <br />storm event Soil infiltration rates shall be based on <br />the appropriate HSG classification and associated <br />infiltration rates (see Table 1 in Appendix C). <br />Infiltration area will be limited to the horizontal <br />areas subject to prolonged wetting; and <br />(c) A minimum of three feet of separation from <br />the seasonal high water table. <br />(fj) Permanent sedimentation and water quality ponds are- required <br />andmust be designed to provide: <br />(4-a) Water quality features <br />consistent with NURP criteria and District wet pond <br />criteria (see appendix) <br />.t <br />(2b) A permanent wet pool with <br />dead storage of at least equal to the runoff from a <br />2.5 -inch rainfall over the area tributary to the pond:; <br />an <br />(4) An outlet structure capable of <br />preventing migration of floating debris and oils for <br />at least the one -year storm. <br />during or after construction. <br />(h) Stermwate Management s under this -rule must confer -with <br />- - - - " - • - - - - - .. - Plans. <br />Detention basins must be designed to provide: <br />(a) An outlet structure to control the two -year & <br />100 -year frequency events to pre - settlement peak <br />runoff sites; and <br />bbl An identified overflow spillway sufficiently <br />stabilized to convey flows greater than the 100 -year <br />Qritical storm event. <br />DRAFT DOCUMENT <br />16 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.