My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/25/2007 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2007
>
07/25/2007 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 1:07:39 PM
Creation date
8/7/2014 9:23:38 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/25/2007
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Agenda Item 6B <br />Environmental Board Meeting Date: May 30, 2007 <br />Topic: Main Street Village <br />Background: <br />Request <br />The project proposal is located in the SE corner of Main Street/35E interchange <br />(Attachment 1). <br />The proposed project consists of a 6 -lot/ four -lot built commercial site to be <br />known as Main Street Village. Approximately 7.5 acres of the 30 acre site is <br />proposed to be developed. <br />Although the proposed review is only 7.5 acres out of 30 acres, staff maintains <br />that without some build out analysis, in particular proof (soil borings) that the <br />future southern road connection will work, that this project will fail to be approved, <br />and is thus determined to be incomplete. <br />Site Data <br />Total acres: 28.33 <br />Number of Lots: 6 <br />Existing Zoning: General Business <br />Proposed Zoning: General Business <br />Public Utilities: Sewer and Water <br />Proposed Businesses: Gas station /convenience store /car wash, retail strip. <br />Total Impervious Area: 4.94 Acres (57.4% of total). <br />Analysis: <br />Surface Water <br />The site is tributary to Clearwater Creek via stormsewer along Otter Lake Road. <br />The proposed stormwater management plan includes a NURP pond and a <br />biofiltration basin serving the western portion of the site and six bioflitration <br />basins serving the eastern portion of the site. <br />The six biofiltration basins serving the eastern portion of the site will discharge to <br />the city stormsewer system and ultimately to regional pond -2, constructed in <br />
The URL can be used to link to this page
Your browser does not support the video tag.