The original revised plan called for three variances. After discussion at the P & Z <br />meeting, the City Engineer suggested that the trail shown behind lots 1 and 2 be located <br />on a required drainage easement which is actually a pipe to carry drainage under the <br />roadway. This allows the lots to meet the minimum depth requirement since the <br />easement is within the lot lines and eliminates would eliminate the need for the variances <br />while still allowing the trail link connection. The applicant agreed to the change as did <br />the P & Z members. The remaining variances to be considered are: <br />- A variance for lot width at the building setback line for Lot 7, Block 4. <br />This lot is deficient in width at the 30' building setback line. However, a structure <br />can not be built at the setback line due to an existing pipeline easement, it must be <br />setback 100 -120' at which point the lot exceeds the 80' width requirement. The <br />purpose of the lot width requirement is to insure that a structure can be built and <br />still meet the setback requirement. <br />- A variance for cul -de -sac length granted with the original preliminary plat <br />approval. The subdivision ordinance requires a maximum cul -de -sac length of <br />500', the proposed roadway is approximately 780'. <br />Findings of Fact. In considering all requests for variance or appeal and in taking subsequent action, the <br />City shall make a fmding of fact: <br />1. That the property in question cannot be put to a reasonable use if used under conditions allowed by the <br />official controls. <br />2. That the plight of the landowners is due to physical circumstances unique to his property not created <br />by the land owner. <br />3. That the hardship is not due to economic considerations alone and a reasonable use for the property <br />exists under the terms of the ordinance. <br />4. That granting the variance requested will not confer on the applicant any special privilege that would <br />be denied by this ordinance to other lands, structures, or buildings in the same district. <br />5. That the proposed actions will be in keeping with the spirit and intent of the ordinance. <br />The Planning and Zoning Board agreed with staff that all five criteria can be met in <br />relation to the variance requests for Lot 7, Block 4 and the cul -de -sac length and <br />recommended approval. <br />The Environmental Board and the Park Board have both reviewed this revised plat and <br />are supportive of the proposed revisions. The ponding area and adjacent outlot are <br />proposed to be dedicated to the City for open space and the trail will connect from the <br />2nd addition through the 5th to the park area and also northerly to the 6th addition and <br />future Molitor expansion area. Overall a total of 10.178 gross acres will be available for <br />park/open space /greenway. It is the applicants intention to dedicate this land to the City. <br />On Tuesday, March 2nd, Mr. Uhde held a neighborhood meeting. At that meeting, <br />several issues were raise that included the planting of boulevard trees, completion of the <br />pond area, final grading, removal of existing dirt and brush piles and other related <br />concerns. A letter from the residents and a response from Mr. Uhde with a timetable as <br />