|
City of Lino Lakes, Minnesota
<br />Apollo Drive - Phase 3
<br />SEH No. A- L1NOL9808.01
<br />Bid Tabulation
<br />Item Item
<br />No. No. Description
<br />Northwest Asphalt Inc.
<br />Unit Total
<br />Unit Qty. Price Cost
<br />S.R. Weidema, Inc. Richard Knutson,lnc. Hardrives Inc.
<br />Unit Total Unit Total Unit Total
<br />Price Cost Price Cost Price Cost
<br />1 2021.501 Mobilization
<br />2 2101.502 Clearing
<br />3 2101.507 Grubbing
<br />4 2104.501 Remove Culverts
<br />5 2104.501 Remove Curb and Gutter
<br />6 2104.505 Remove Bituminous Pavement
<br />7 2104.513 Saw Cut Bituminous Pavement
<br />8 2104.523 Salvage Type C Signs
<br />9 2104.523 Salvage Hazard Marker X4 -2
<br />10 2104.528 Salvage Type D Signs
<br />11 2105.501 Common Excavation (P)
<br />12 2105.511 Common Channel Excavation (P)
<br />13 2105.525 Topsoil Borrow (LV)
<br />14 2111.501 Test Rolling _
<br />15 2112.501 Subgrade Preparation
<br />16 2130.501 Water for Dust Control
<br />17 2211.501 Aggregate Base pass 5 (100% Crushed Umestone)
<br />18 2331.51 Type 31 Bituminous Binder
<br />19 2331.514 Type 31 Bituminous Base
<br />20 2341.508 Type 41 Bituminous Wear
<br />21 2357.502 Bituminous Material for Tack Coat
<br />22 2501.511 121 RCP Class V
<br />23 2501.511 151 RCP Class V
<br />24 2501.511 18' RCP Class V
<br />03/12/991026 AM
<br />L.S.
<br />Tree
<br />Tree
<br />L.F.
<br />L.F.
<br />S.Y.
<br />L.F.
<br />Each
<br />Each
<br />C.Y.
<br />C.Y.
<br />C.Y.
<br />R.S.
<br />R.S.
<br />M (Gal.)
<br />Ton
<br />Ton
<br />Ton
<br />Ton
<br />Gal.
<br />L.F.
<br />L.F.
<br />L.F.
<br />1 $8,500.00
<br />18 100.00
<br />18 25.00
<br />185 6.30
<br />250 4.00
<br />3,390 124
<br />1,050 1.31
<br />34 35.00
<br />2 35.00
<br />1 35.00
<br />5,500 3.25
<br />5,500 2.30
<br />1,754 6.45
<br />15 35.00
<br />15 120.00
<br />15 25.00
<br />3,400 10.87
<br />865 22.64
<br />3,215 23.07
<br />1,025 25.36
<br />1,000 1.00
<br />400 21.53
<br />147 24.36
<br />144 27.46
<br />$8,500.00
<br />1,800.00
<br />450.00
<br />1,165.50
<br />1,000.00
<br />4,203.60
<br />1,375.50
<br />1,190.00
<br />70.00
<br />35.00
<br />17,875.00
<br />12,650.00
<br />11,313.30
<br />525.00
<br />1,800.00
<br />375.00
<br />36,958.00
<br />19,583.60
<br />74,170.05
<br />25,994.00
<br />1,000.00
<br />8,612.00
<br />3,580.92.
<br />3,95424
<br />$19,885.00 $19,885.00 $15,500.00 $15,500.00 $6,200.00 $6,200.00
<br />103.00 1,854.00 178.50 3,213.00 75.00 1,350.00
<br />51.50 927.00 102.00 1,836.00 25.00 450.00
<br />8.35 1,544.75 8.00 1,480.00 6.60 1,221.00
<br />3.10 775.00 5.00 1,250.00 3.30 825.00
<br />1.03 3,491.70 1.00 3,390.00 2.30 7,797.00
<br />1.55 1,627.50 3.06 3,213.00 2.50 2,625.00
<br />10.30 350.20 20.40 693.60 11.00 374.00
<br />51.50 103.00 20.40 40.80 11.00 22.00
<br />51.50 51.50 20.40 20.40 33.00 33.00
<br />2.68 14,740.00 5.00 27,500.00 4.95 27,225.00
<br />2.68 14,740.00 4.50 24,750.00 4.85 26,675.00
<br />2.57 4,507.78 8.50 14,909.00 7.40 12,979.60
<br />10.30 154.50 150.00 2,250.00 15.00 225.00
<br />283.00 4,245.00 250.00 3,750.00 115.00 1,725.00
<br />10.30 154.50 25.00 375.00 15.00 225.00
<br />10.60 36,040.00 10.08 34,272.00 10.75 36,550.00
<br />22.50 19,462.50 25.10 21,711.50 24.60 21,279.00
<br />22.50 72,337.50 2423 77,899.45 23.75 76,35¢25
<br />24.57 25,18425 26.32 26,978.00 25.80 26,445.00
<br />1.30 1,300.00 1.02 1,020.00 1.00 1,000.00
<br />31.75 12,700.00 20.93 8,372.00 22.55 9,020.00
<br />33.40 4,909.80 23.26 3,419.22 25.50 3,748.50
<br />31.85 4,586.40 25.16 3,623.04 28.75 4,140.00
<br />Short Elliott Hendrickson Inc. Page 3 of 5
<br />
|