Laserfiche WebLink
2. Water flow recording meters shall be installed at the interconnection line <br />for the purpose of measuring the flow from the Lino Lakes water system into the <br />Centerville water system and the flow from the Centerville water system into the Lino <br />Lakes water system. <br />3. Lino Lakes shall have ownership and be responsible for operation and <br />maintenance of the water line located within the corporate boundaries of Lino Lakes. <br />Centerville shall have ownership and be responsible for operation and maintenance of the <br />interconnection line, metering manhole, and appurtenances of the water lines located <br />within the corporate boundaries of Centerville. <br />4. Centerville shall commence with the design of the metering manhole within <br />60 days of the date of this agreement. Centerville shall, within nine (9) months from the <br />date of this agreement, construct and have operational the metering manhole. <br />5. The meter shall operate automatically according to an agreed upon <br />telemetry system to provide each City with water during an emergency condition. <br />6. The City of Centerville shall complete the construction of a water storage <br />reservoir within a minimum of eight (8) years from the date of execution of this <br />Agreement. The City of Lino Lakes may extend the time period for the City of Centerville <br />to construct the water storage reservoir based on recommendations from the Lino Lakes <br />Comprehensive Water Plan. <br />7. The City of Centerville shall adopt an "odd/even" lawn watering policy. <br />The City of Centerville shall comply with and enforce total lawn watering bans that may <br />be implemented by the City of Lino Lakes on Lino Lakes water customers. <br />SECTION 2. CHARGES <br />Each of the meters installed pursuant to this Agreement shall be read at the end of <br />each calendar quarter. The city with the greatest net flow will bill the other city, by the <br />10th of the month following the end of the calendar quarter, for the amount due based <br />upon such excess flow. Payments for water usage shall be at the current respective City <br />residential water rate at the time of billing. Payments shall be made on or before the 20th <br />day of the month following the end of the quarter, and shall be administered by current <br />city ordinance. Centerville shall pay for project costs, including construction costs, pre - <br />engineering, and construction engineering, for the Centerville meter vault systems. Lino <br />Lakes shall pay for the cost of the Lino Lakes control systems. <br />2 <br />