Laserfiche WebLink
10. All plan sheets shall include a legend indicating meaning of differing line types, <br />hatching marks, etc. <br />11. Sheet 3-Preliminary Plat: <br />a. Proposed drainage & utility easements shall be shown. <br />12. Sheet 4-Grading, Drainage & Erosion Control Plan: <br />a. Water table data shall be shown. <br />b. Location of soil borings shall be shown. <br />13. Sheet 6-Landscaping Plan: <br />a. Indicate what hatched areas represent. <br />b. Open space calculations shall be shown on plan sheet as required per <br />ordinance. Please review page 3-38 of Section 3, Required Screening, <br />Landscaping and Buffer Yards. <br />c. Normal water level of storm water pond shall be indicated. <br />d. Sizes of willow and ash tree near stormwater pond are inconsistent with <br />sizes shown on Sheet 7, Tree Preservation Plan. Please revise. <br />e. Seed mix type shall be indicated on plan sheet. <br />14. Tree Preservation Plan <br />a. Re -number plan sheet as 7 of 7. <br />b. The developer shall submit a complete Tree Preservation and Mitigation <br />Plan in full compliance with the tree preservation and mitigation <br />ordinance. <br />i. The Tree Preservation and Mitigation Standards matrix on page 3- <br />44 of the ordinance shall be calculated and included on the plan <br />sheet. <br />ii. This site is a Non -ESA. <br />iii. Existing trees on site may be used to fulfill tree mitigation <br />requirements; however, the developer shall provide calculations in <br />order to make such determination. <br />c. Fencing, tree preservation measures and erosion control shall be installed <br />by the developer and inspected by the City prior to any soil disturbance. <br />15. Final Plat <br />a. The developer shall verify the drainage and utility easement is 10 feet <br />around the boundary of the wetland delineation. <br />b. The developer shall verify the drainage and utility easement is a minimum <br />of 10 feet beyond the basin's 100-year storm high water level elevation. <br />c. The City Attorney shall review the final plat and title commitment. <br />i. Title issue regarding Debbie Tschida shall be resolved. <br />ii. Title issue regarding Nate Helmueller shall be resolved. <br />ATTACHMENTS <br />1. Site Location Map <br />2. Aerial Map <br />3. City Engineer Letter dated July 25, 2014 <br />4. Environmental Coordinator Letter dated August 7, 2014 <br />5. Final Plat-Talan Ridge <br />7 <br />