My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/12/1999 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1999
>
04/12/1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 3:10:36 PM
Creation date
8/11/2014 12:15:27 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/12/1999
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rezoning, PDO Development Plan <br />Outlot B Apollo Business Park No. 2 <br />April 12, 1999 <br />page 5 <br />Future Subdivision: Mr. Fogarty's plan is to subdivide the parcel in the future into three <br />lots. Buildings A and C each would be on a separate lot, and buildings B and D would be <br />on the same lot. Though the current application does not include subdivision, a review of <br />the future lots is in order as part of the PDO to ensure the development plan is workable. <br />Though a planned development offers flexibility, the LI Light Industrial zoning district <br />provides guidance. All lots meet the minimum LI lot size of one acre and all LI building <br />setbacks from lot lines and other buildings are met. Easements typically are required <br />along property lines when a subdivision occurs and the structures located as shown would <br />not interfere with these easements. <br />Green Space and Building Coverage: The Light Industrial zone requires at least 10% <br />landscaped area. The entire project area has 20 % green area (51,231 sf). The General <br />Business district requires 25% green area. Because this is essentially an industrial use, <br />the LI standard is more appropriate. However, because of the location next to a GB zone, <br />staff recommends that the 20% is a good compromise. <br />Landscaping Plan: The LI district requires a 40' landscaped buffer where a lot line <br />coincides with an adjacent commercial district. Landscaping, planting, berming, or other <br />effective screening is required. Though a PDO is not necessarily bound by this, <br />substantive screening would be appropriate given the rezoning to allow industrial uses <br />next to the clinic. <br />A landscaping plan has been submitted, but it was unacceptable. A second landscaping <br />plan was submitted showing a new access and some additional screening. The City <br />Environmental Specialist has prepared recommendations and a new landscaping plan <br />must be submitted. The recommendations are included as conditions of approval in <br />addition to those approved by P & Z. <br />Parking: Parking requirements are as follows: office areas, three stalls plus one stall per <br />200 sf; warehousing, one stall per 2,000 sf. <br />The individual unit areas within each building will have different amounts of office space <br />depending on the tenant needs. If we assume that 5% of the floor area will be used for <br />office, the following calculations apply. The plan provides ample parking. <br />
The URL can be used to link to this page
Your browser does not support the video tag.