Laserfiche WebLink
Memorandum <br />DATE: March 4, 1999 <br />TO: Mary Kay Wyland <br />FROM: John Powell, City Engineer <br />RE: Lino Lakes Business Center , VI, VII <br />I have reviewed the plan for the referenced project which was prepared by <br />Development Engineering, P.A.; dated January 18, 1999; which was revised on <br />February 11, 1999. My comments are as follows: <br />1. This review was prepared with the understanding that units A and B will be <br />constructed in 1999, and units C and D will be completed by the end of 2000. <br />Any alteration of this schedule will require an additional review. <br />2. The reference to a "core cut" into the existing sanitary sewer manhole is to be <br />deleted. Service to the site will be provided exclusively by existing service <br />stubs which have been extended to the property line. No disturbance of the <br />existing roadway will be allowed. <br />3. Proposed MH 1 is to be located outside of the Apollo Drive right -of -way. <br />4. Apollo Drive is an Anoka County roadway, any work within the right -of -way <br />will require a permit from the County. <br />5. The manhole over the existing 21" RCP should be shown as a proposed <br />manhole. <br />6. The existing 21" RCP storm sewer stub has a designed capacity of 10 cfs. In <br />addition to the flow from the Clinic site, the proposed site plan showsl9 cfs <br />being discharged into this stub. The City will require that a flow restriction be <br />placed in proposed CB 1 which limits the discharge from this site to the <br />available capacity in the 21" storm sewer stub. <br />7. If not already in place, gate valves must be installed at each connection to <br />the City water services. <br />8. The proposed Site Plan must be approved by the Rice Creek Watershed <br />District and the Minnesota Department of Transportation. <br />1189 Main Street • Lino Lakes, Minnesota • 55014 <br />