Laserfiche WebLink
ATTACHMENT C <br />page 1 of 2 <br />Clearwater Creek Third Addition — Phase I <br />Open Space Management Plan <br />A. Grading Plan <br />1. Developer will install silt fences to define protection zones and control erosion. <br />2. Developer's grading plan will include swales and infiltration where possible based on <br />the City Engineer advice and approval. <br />3. The grading plan will identify access points for vehicles to prevent driving through <br />protection areas. <br />4. The grading plan will identify stockpiling areas. <br />5. The grading plan will identify an area for concrete truck clean out. <br />6. The Developer will install signage to keep construction vehicles and activity out of <br />protection areas. <br />7. 100% of grading in Phase I will be completed, including revegetation of ponding <br />areas, before any building permits are to be issued for Phase II <br />B. Tree Preservation Plan <br />1. Developer will submit a tree survey that will: <br />a. identify trees 6" or greater diameter in all areas to be disturbed <br />b. identify trees 6" or greater diameter within 50 feet of areas to be disturbed <br />1. Developer will install tree protection fences as determined by City Forester. <br />2. Developer will submit a tree replacement plan that includes the grading plan. <br />3. Developer will escrow $225.00 per lot for boulevard trees. <br />C. Open Space Management <br />1. City Forester will coordinate with Developer scheduling of vegetation and spoil <br />banks inspection. <br />2. City Forester will identify areas to remove vegetation (brush, weeds) in open space. <br />3. City Forester will identify spoil banks in open space. <br />4. City staff and Developer will negotiate reasonable amount and areas of vegetation <br />removal, including trees, and determine best method of removal. <br />5. City staff and Developer will negotiate reasonable amount and areas of spoil bank <br />removal. <br />6. Developer will remove vegetation as agreed. <br />7. Developer will remove spoil banks as agreed. <br />