My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
02/23/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 1:20:23 PM
Creation date
8/18/2014 1:15:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/23/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7B <br />STAFF ORIGINATOR: David Ahrens, Public Works Director /City Engineer <br />DATE: February 23, 1998 <br />TOPIC: Resolution No. 98 -20 Ware Road Reconstruction and Utility <br />Improvements - Approve Plans and Specifications and Order <br />Advertisement to Receive Bids. <br />INTRODUCTION: <br />The City is proposing the reconstruction of Ware Road and related utility improvements. <br />A feasibility report was prepared for the City by OSM and received by the City Council <br />on May 12, 1997. A public hearing was held on June 23, 1997, for the proposed <br />improvements. The Council then ordrered the preparation of plans and Specifications for <br />the project. Council action is required to order the advertisement to receive bids. <br />BACKGROUND: <br />The road surface of Ware Road is in need of major repair. Utilities on Ware Road will <br />be extended from Coyote Trail south to Ash Street concurrent with the street <br />reconstruction. Currently there is no sanitary sewer or watermain in this location. <br />Residents in this area are currently using private wells and septic systems. Since the <br />close of the public hearing on June 23, 1997, City staff have received petitions from the <br />residents of Ware Road against the street and utility assessments. <br />DISCUSSION: <br />The pavement on Ware Road is in poor condition and requires ongoing City maintenance. <br />The existing street section does not meet the current City standards or municipal State <br />Aid standards for the existing or anticipated traffic. A combination bike and pedestrian <br />trail is also proposed along the east side of Ware Road. Currently, all pedestrian and <br />bicycle traffic uses the existing street. <br />The proposed project will replace the existing rural street with an urban section utilizing <br />curb and gutter. The eet will be 32 feet wide from Arrowhead Drive to Ash Street <br />(County Road J) an 6 eet wide from Arrowhead to Birch to allow for parking on the <br />east side of Ware R. = An 8 foot wide bike trail will be constructed along the east side <br />of Ware Road. The bike all will be separated from Ware Road by a 4 foot boulevard. <br />[/-1JA/Ixoowei 1.44met- <br />
The URL can be used to link to this page
Your browser does not support the video tag.