My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
02/23/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 1:20:23 PM
Creation date
8/18/2014 1:15:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/23/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A sanitary lift station is required to minimize sewer depth south of 62nd Street. The <br />proposed lift station will be located approximately 1000 feet north of County Road J. This <br />lift station will serve the area south of 62nd Street. <br />The roadside swale will be regraded to improve lot drainage. One pond will need to be <br />constructed to handle roadway runoff. This pond will be located along existing County <br />ditches but will require easements. <br />At the time the street is being replaced the project will extend the utilities from Coyote <br />Trail south to Ash Street. Currently the MUSA boundary is not extended along that <br />section of Ware Road, but it is anticipated that boundary will be extended to include this <br />area in the near future. Sewer and water service stubs will be provided for all properties. <br />The design life of the road is estimated at 25 to 30 years. Placing utilities at the time of <br />street construction will minimize the need to disturb the street surface for utility <br />construction. <br />The project will be phased to allow for continued access to properties along Ware Road. <br />It is anticpated that the break point for the phasing will be at 62nd Street. <br />SCHEDULE: <br />The Ware Road reconstruction is scheduled as follows: <br />Advertise to recieve bids <br />Receive Bids <br />Award Contract <br />Preconstruction Meeting <br />Utility Construction Begins <br />Street Construction Begins <br />Estimated Construction Completion <br />FINANCING: <br />February 25, 1998 <br />March 27, 1998 <br />April 13, 1998 <br />April 20, 1998 <br />April 27, 1998 <br />June 1, 1998 <br />September 25, 1998 <br />The City will pay for the project by MSAS, Surface Water Management Funds, Area and <br />Unit Funds and special assessments to the developer of Miller's South Glen. The <br />residents along Ware Road will not be assessed for the street improvements. These <br />residents will be required to pay hook up charges for water and sewer service at the time <br />of connection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.