My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/09/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
03/09/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 1:12:52 PM
Creation date
8/18/2014 1:50:24 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/09/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHERN STATES POWER CO ENGINEERING AND CONSTRUCTION MINNEAPOLIS <br />DISTRIBUTION DATE TRANSMITTED <br />1 ROSKOS GF 1 MAKI HJ ORIGINAL <br />9 PLOURDE FJ 1 STRONG JW JR <br />1 REDER WK 1 VOLKMANN TL <br />1 MACFARLANE CS 1 REQUESTOR <br />1 NODES GA <br />97EK01 <br />THE ThIS ESTIMATE $ 20 000 <br />NSP (MINNESOTA) METRO EAST REGION <br />ARDEN HILLS TO WYOMING, 0736 <br />CITY OF LINO LAKES OTTERLAKE ROAD REALINGNMENT <br />ASSIGNED TO TRANSMISSION COMPLETE 08 -01 -97 <br />REQUESTED 01 -15 -97 BY TINA- .OLSON . <br />DESCRIPTION <br />SEE DESIGN GUIDE <br />THE LABOR FOR THIS ESTIMATE HAS BEEN BASED ON AVERAGE WEATHER CONDITIONS <br />AND ON AN AVERAGE ANTICIPATED AMOUNT OF OVERTIME FOR CRITICAL OUTAGES <br />AND CUTOVERS. ALL COSTS ARE BASED ON CURRENT PRICES, WITH THE FOLLOWING <br />FACTORS APPLIED AS APPROPRIATE: <br />LABOR ESCALATION <br />MATERIAL ESCALATION <br />LABOR ADJUSTMENT <br />2.0% ADMINISTRATION & GENERAL 1.5% <br />4.0% AFUDC IS NOT INCLUDED IN THIS ESTIMATE <br />0.0% <br />ESTIMATE SUMMARY <br />WOOD POLES AND FIXTURES $ 5 181 <br />OVERHEAD CONDUCTOR AND DEVICES $ 1 147 <br />LABOR 5 677 <br />LABOR INDIRECTS 3 066 <br />TOTAL SPECIFIC COSTS $ 15 071 <br />E &S 3 000 <br />A&G 226 <br />TOTAL SPECIFIC, E &S AND A&G $ 18 297 <br />TOTAL OVERHEADS <br />GROSS CONSTRUCTION <br />LESS: OLD CONSTRUCTION REMOVED <br />NET NEW CONSTRUCTION <br />3 226 <br />18 297 <br />2 300 <br />$ 15 997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.