My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
06/08/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 3:43:27 PM
Creation date
8/19/2014 11:54:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/08/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -- CERTIFICATION PROCESS <br />REHABILITATION OF SANITARY STRUCTURES <br />AND <br />PIPELINE REPAIRS <br />STRUCTURES <br />The first, third and fifth year certification shall be based on findings resulting from an inspection of <br />100% of all sanitary sewer structures rehabilitated under the Loan Project. The second and forth <br />year certification shall be based on findings resulting from an inspection of 33% of all sanitary <br />sewer structures rehabilitated under the Loan Project. <br />On the third and fifth Anniversary Dates, along with said certification, Lendee shall also provide <br />the Council with physical documentation supporting the certification in the form of visual <br />inspection records of 100% of all structures requiring rehabilitation during the initial project. <br />The inspections shall consist of visual observations of each sanitary structure identified on each <br />annual certification inspection list. The Council reserves the right to select specific structures for <br />reinspection. Those structures that the Council selects will be from those identified in the "Final <br />Project Summary Report," according to paragraph 5.02, as being part of the overall rehabilitation <br />project. <br />PIPELINES <br />The first and fifth year certification shall be based on findings resulting from an inspection of <br />100% of the sanitary sewer pipeline footage rehabilitated under the Loan Project. The second, <br />third and forth year certification shall be based on findings resulting from an inspection of 33% of <br />all sanitary sewer pipeline segments rehabilitated under the Loan Project. If the Loan Project <br />involves the rehabilitation of a single pipeline segment, then 100% of said segment shall be <br />inspected in the second, third and fourth year certification. <br />On the third and fifth anniversary dates, along with said certification, Lendee shall also provide <br />the Council with physical documentation supporting the certification in the form of visual <br />inspection records of 100% of all pipeline segments requiring rehabilitation during the initial <br />project. <br />Prior to the community performing the certification inspections, the Council will be notified so <br />that a representative from the Council has the opportunity to be present during the inspections. <br />All facilities to be inspected for certification shall be identified prior to the inspections and a list of <br />said facilities along with a map showing their locations shall be sent to the Council for review and <br />comment. Certification inspections shall be performed during periods when I/I sources would <br />typically be discharged into the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.