Laserfiche WebLink
• <br />proposed drive through. <br />Provide right -in only from Apollo Drive extension to loading area on north <br />side of 72,000 sq. ft. structure. with access to Apollo Drive near Lake Drive <br />intersection via a defined access road. <br />• Include more pedestrian circulation opportunities throughout the <br />development. <br />• Provide a 50 foot principal building setback from Apollo Drive. <br />2. Resolve location of Apollo Drive / 77th Street Intersection. <br />3. Accesses to development from Lake Drive should complement interior site <br />circulation. <br />4. Reduce parking stall supply to a number more approximate to the estimated parking <br />stall requirement outlined herein. <br />5. Explore alternative options for reducing the number of required parking stalls and <br />methods of construction as suggested by the Environmental Board. <br />6. Indicate provision of significant landscaping along north property line of phase 1 to <br />screen loading areas of the 72,000 sq. ft. building. <br />7. Address the infiltration issues identified by the Environmental Review Board. <br />8. Coordinate a tree preservation plan with the City Forester. <br />9. Comments of other City Staff. <br />8 <br />