My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/09/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
11/09/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 1:33:15 PM
Creation date
8/26/2014 11:48:36 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/09/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. I -35E Crossing - 260 lineal feet of 36 -inch diameter casing pipe with .531 - <br />inch wall thickness. <br />b. Otter Lake Road Crossing - 135 feet of 36 -inch casing pipe with .531 -inch <br />wall thickness to be installed beneath the intersection of Otter Lake Road and Cedar <br />Street. <br />9. It is contemplated that said work to be carried out by the parties hereto under the <br />provisions of Minnesota Statutes Section 471.59 and that the Council Project will be constructed <br />by Lino Lakes as part of Lino Lakes' Otter Lake Road Realignment and Forcemain and Lift <br />Station Projects. <br />10. An engineer's estimate of quantities and unit prices of material and labor for the <br />Council Project has been prepared and a copy of said estimate is attached hereto as Exhibit A and <br />by this reference made a part hereof. <br />NOW THEREFORE, IT IS HEREBY AGREED: <br />I. <br />Lino Lakes will prepare and submit to the Council and the Council will review and <br />approve the final construction documents which include plans, specifications, and a proposed <br />construction schedule pertaining to the Council Project. The Council will provide to Lino Lakes <br />the soil borings and geotechnical report for the Council Project crossing I -35E. <br />The aforesaid final construction documents will show the proposed construction schedule <br />and provide that: <br />a. Casing pipe shall be installed at locations and grade provided by the Council. <br />b. Construction and permanent installation shall conform with requirements of the <br />Minnesota Department of Transportation (MnDOT). <br />c. The construction schedule shall provide for completion of the Council Project by <br />April 30, 1999. <br />II. <br />The Council in connection with the Council Project, does hereby appoint the City <br />of Lino Lakes as its agent to prepare final construction documents, to advertise for bids for the <br />work and construction of the Council Project, receive and open bids, pursuant to said <br />advertisement and enter into a contract with a successful bidder at the unit prices specified in the <br />bid of such bidder, and to construct the Council Project in accordance with plans and <br />specifications designated as the Council Project which construction documents are a part of Lino <br />Lakes' construction documents for its Otter Lake Road Realignment and Forcemain and Lift <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.