My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/23/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
11/23/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 1:29:09 PM
Creation date
8/26/2014 12:20:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/23/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE 3: DEVELOPMENT STANDARDS $50,000 <br />11] General Zoning Overlay Standards $15,000 <br />A set of reusable 'Block Standards' will be developed which will allow the City to regulate key <br />aspects of future development. These measurable standards can be applied through simple <br />administrative review of projects, while offering developers flexibility. They will be crafted to <br />result in a high - quality mixed -use pedestrian- oriented town center. A description of techniques for <br />modifications and variances will be included. <br />Products: Block Standards for Town Center <br />12] Design Guidelines $30,000 <br />Guidelines for the land use components will be developed to control the ultimate builders. <br />Individual packages of urban and architectural controls will be developed for the various <br />residential, commercial and mixed use types contained within the town center. Landscape, signage <br />and lighting controls are not included. <br />Products: Design Guidelines for Town Center <br />13] Public Presentation and Working Session $5,000 <br />An Associate will travel to Lino Lakes to present Phase 2 materials to the community, and discuss <br />needed refinements with City staff so that materials can be finalized. <br />Products: One -Day Visit, Public Presentation & Working Session with staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.