Laserfiche WebLink
• <br />• <br />STAFF ORIGINATOR: <br />CITY COUNCIL <br />MEETING DATE: <br />TOPIC: <br />AGENDA ITEM 6A <br />James E. Studenski, City Engineer <br />September 28, 2009 <br />Resolution No. 09 -71, Accepting Feasibility <br />Report and Calling for a Public Hearing, <br />Pine Street Paving Improvement Project <br />ACTION REQUIRED: 4/5 Vote <br />BACKGROUND <br />The Pine Street Paving Improvement Project Feasibility Report was authorized by the <br />City Council on July 13, 2009. The report was initiated by a resident petition to research <br />the costs of paving Pine Street. <br />The attached feasibility report dated September 23, 2009 includes paving and minor <br />surface water management improvements for Pine Street from both Lake Drive to the <br />Westem Terminus and Lake Drive to 4th Avenue. This report was prepared in <br />coordination with the City of Columbus. The estimated improvement project costs to <br />pave Pine Street from Lake Drive to the western terminus are $699,500 and $398,500 to <br />pave from Lake Drive to 4th Avenue. The estimated project costs include a 5% <br />contingency and 20% indirect costs (legal, engineering, and administrative). <br />The City of Columbus is going through their process for the feasibility report with their <br />pertinent assessment information attached. City staff will continue to work with City of <br />Columbus staff on a Joint Powers Agreement for this project. <br />The Lino Lakes public hearing will be held at the October 26th City Council Meeting. <br />RECOMMENDATION <br />Staff recommends accepting Resolution No. 09 -71, Accepting Feasibility Report and <br />Calling for a Public Hearing, Pine Street Paving Improvement Project. <br />