Laserfiche WebLink
e 1 Cc,,ad-- <br />APPLICATION FOR PAYMENT NO. 14 (Final) <br />SE1.1 No: <br />A- LINOL0305.03 Location: Lino Lakes, Minnesota <br />C *tor: <br />Contract for: <br />Jay Bros., Inc. <br />PO Box 700 <br />9218 Lake Drive NE <br />Forest Lake, MN 55025 <br />Owner: City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 -1182 <br />Legacy at Woods Edge - Phase 3 Contract Date: April 25, 2006 <br />Streetscape, Planting and Irrigation Plans Contract Amount: $725,352.61 Base Bid <br />Period Ending: ,December 9, 2008 <br />Alternate 1: $824,379.77 Total: $1,549,732.38 <br />No. Item <br />Unit <br />Quantity to <br />Est. Qty. Date Unit Price <br />Total <br />BASE (SCHEDULE A) <br />1 MOBILIZATION LUMP SUM 1 1 $22,000.00 $22,000.00 <br />2 TRAFFIC CONTROL LUMP SUM 1 $1,500.00 <br />3 SITE GRADING LUMP SUM 1 1 $24,200.00 $24,200.00 <br />4 SILT FENCE, HEAVY DUTY LF 900 1118 $3.00 $3,354.00 <br />5 15" INLINE YARD DRAIN EACH 1 1 $137.00 $ 137.00 <br />6 15" YARD DRAIN BASIN EACH 1 $95.00 <br />7 STORM SEWER MANHOLE (48" DIA.) EACH 9 2 $920.00 $1,840.00 <br />•ASTING ASSEMBLY MANHOLE, R -1642B EACH 2 2 $290.00 $580.00 <br />9 4" PVC PIPE, SDR 35 LF 100 100 $8.20 $820.00 <br />10 10" PVC PIPE, SDR 35 LF 127 127 $21.06 $2,674.62 <br />11 12" PVC PIPE, SDR 35 LF 9 9 $27.00 $243.00 <br />12 TRENCH DRAIN EACH 1 $780.00 <br />13 CONNECT TO EXISTING STORM SEWER STRUCTURE EACH 1 1 $900.00 $900.00 <br />14 CONCRETE W /DECORATIVE SCORING SF 15060 15060 $4.95 $74,547.00 <br />15 COLORED CONCRETE W /LIGHT BROOM FINISH SF 350 210 $10.56 $2,217.60 <br />16 COLORED CONCRETE W /SMOOTH FINISH SF 150 150 $12.28 $1,842.00 <br />17 CONCRETE, EXPOSED AGGREGATE, 1 -1.5" DIA. SF 363 465 $6.60 $3,069.00 <br />18 CONCRETE PAVERS SF 5406 5489 $4.35 $23,877.15 <br />19 CONCRETE SUB BASE FOR PAVERS SF 5300 5881 $5.00 $29,405.00 <br />20 DETECTABLE WARNING AGGREGATE CONCRETE SF 84 84 $25.00 $2,100.00 <br />21 COBBLES, 3.5 -4" DIA. EACH 83 83 $26.90 $2,232.70 <br />22 CONCRETE PLANTER CURB LF 589 589 $35.00 $20,615.00 <br />*ELECT "B" TOPSOIL BORROW CY 818 1242.5 $36.06 $44,804.55 <br />24 INTERACTIVE WATER FEATURE LUMP SUM 1 1 $82,600.00 $82,600.00 <br />SEH <br />3535 Vadnais Center Drive <br />St. Paul, MN 55110 <br />Detail Page 1 <br />