My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2010-016 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2010
>
2010-016 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2014 1:57:09 PM
Creation date
8/29/2014 12:24:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/22/2010
Council Meeting Type
Regular
Resolution #
10-16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1. The danger to life and property due to increased flood heights or <br />• <br />velocities caused by encroachments; <br />The bridge construction consists of adequate floodplain mitigation <br />for the encroachment on the flood plain. <br />2. The danger that materials may be swept onto other lands or <br />downstream to the injury of others or they may block bridges, culverts or other <br />hydraulic structures; <br />Some floodplain areas will be filled during bridge construction. An <br />adequate mitigation area has been designed to replace the flood <br />plain areas filled for construction. Outside of the areas proposed to <br />be fill as shown on the attached plans the construction <br />specifications require the contractor to ensure that debris and <br />materials will not be placed in any adjacent waters or wetlands. <br />3. The proposed water supply and sanitation systems and the <br />ability of these systems to prevent disease, contamination, and unsanitary <br />conditions; <br />No water supply or sanitation systems will be constructed with this <br />project. <br />4. The susceptibility of the proposed facility and its contents to flood <br />damage and the effect of the damage on the individual owner; <br />The bridge deck is proposed to be constructed approximately one <br />foot above the 100 year floodplain elevation off 886.1. The portions <br />of the structure below the 100 year flood elevation will be under <br />water during a flood event. Bank stabilization and erosion control <br />measures will be installed to aid in the protection of the bridge from <br />flood damage. <br />5. The importance of the services provided by the proposed facility <br />to the community; <br />The bridges allow customers of the Chomonix Golf Course to access <br />the northern holes. <br />6. The requirement of the facility for a waterfront location; <br />The Chomonix Golf Course was built around Rice Creek about 25 <br />years ago to utilize the natural features as part of the golf course <br />design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.