My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2010-023 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2010
>
2010-023 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2014 1:56:19 PM
Creation date
8/29/2014 1:19:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/08/2010
Council Meeting Type
Regular
Resolution #
10-23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />viniDO FP-2460-0112-92) <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 20 <br />Contractor: Lunda Construction Co. State Project No.: 0280 -55 <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />The aggregate test reports and material disposition forms compiled by Mn /DOT indicate that on 5 -9 -08 the <br />coarse aggregate for ready -mix concrete supplied by Cemstone Plant #7 & #17 Blaine failed to meet the <br />gradation requirements for Mn /DOT Specification 3137 CA -50. <br />This concrete was used for Bridge No. 02817 North Approach Panel. <br />Upon recommendation of the Concrete Office, the concrete containing the deficient material will be allowed to <br />remain in place at a reduced price. The dollar amount to be deducted from the Contractor's project payable <br />monies is computed as shown below in the Estimate of Costs. <br />Decrease - Group No. #1 @ 100% <br />Description <br />Deduct for Failing Gradation <br />Lab. No. 32A <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased ( ) by Calendar Days <br />Is decreased ( ) by Calendar Days <br />b. Is not changed ( X ) <br />c. May be revised if the woik affected <br />the controlling operation ( ) <br />Estimate of Costs <br />Unit Quantity Unit Price Amount <br />CY <br />10 -S16.50 - $165.00 <br />Total Credit this Change Order - $165.00 <br />Project/Resident /County Engineer <br />Date <br />Approved By: <br />City of Lino Lakes <br />Date <br />Approved By: <br />Anoka County <br />Accepted By: <br />Date <br />Contractor's Authorized Representative <br />Original to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County <br />Z -z9 - -0 <br />Da te <br />
The URL can be used to link to this page
Your browser does not support the video tag.