Laserfiche WebLink
• <br />• <br />• <br />ESTIMATE NO. 3(f) <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14292.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: May 28. 2010 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 5 - STAGECOACH TRAIL <br />1 MOBILIZATION LS 1 1.0 $ 500.00 5 500.00 <br />2 EXCAVATION AND GRADING CY 20 7.D $ 50.00 $ 350.00 <br />3 4" PE PERFORATED DRAINTILE W/ ROCK AND FABRIC WRAP LF 100 124.0 $ 20.00 $ 2,480.00 <br />4 INSTALL YARD DRAIN BOX EA 1 2.0 $ 1,000.00 $ 2,000.00 <br />5 SPRINKLER REPAIR LS 1 0.0 $ 50.00 $ - <br />6 SOD FOR EXISTING YARD AREA SY 120 50.0 $ 5.00 $ 250.00 <br />SUBTOTAL PROJECT 5 $ 5,580.00 <br />PROJECT 6 - APOLLO MEADOWS TOWNHOMES <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 SALVAGE AND REINSTALL 15" RCP STORM SEWER LF 56 16.0 $ 20.00 $ 320.00 <br />3 SALVAGE AND REINSTALL 15" FES EA 1 1.0 $ 200.00 $ 200.00 <br />4 CONSTRUCT MH OVER EXISTING 15" STORM SEWER, TYPE 409 EA 1 1.0 $ 3,500.00 $ 3,500.00 <br />5 CLASS III RIPRAP W/ FABRIC CY 15 15.0 $ 100.00 $ 1,500.00 <br />6 SOD FOR EXISTING YARD AREA SY 100 5.0 $ 4.00 $ 20.00 <br />7 EROSION CONTROL BLANKET CATEGORY 3 SY 300 300.0 $ 2.00 $ 600.00 <br />8 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 6 $ 7,140.00 <br />PROJECT 7 - LOIS LANE <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 4 5.0 $ 200.00 $ 1,000.00 <br />3 REMOVE 24" APRON EA 1 1.0 $ 200.00 $ 200.00 <br />4 REMOVE STORM SEWER PIPE LF 16 16.0 $ 20.00 $ 320.00 <br />5 24" RCP FES W/ TRASHGUARD EA 1 1.0 5 1,100.00 $ 1,100.00 <br />6 24" RCP STORM SEWER, CLASS 3 LF 16 16.0 $ 80.00 $ 1,280.00 <br />7 CLASS III RIPRAP W/ FABRIC CY 5 5.0 $ 150.00 $ 750.00 <br />8 EROSION CONTROL BLANKET CATEGORY 3 SY 200 180.0 $ 2.00 $ 360.00 <br />9 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 7 $ 6,010.00 <br />PROJECT 8 - BLACKBIRD LANE <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 50 50.0 $ 10.00 $ 500.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 0.0 $ 200.00 $ <br />5 REGRADE DITCH LF 30 40.0 $ 30.00 $ 1,200.00 <br />6 SPRINKLER REPAIR LS 1 0.0 5 50.00 $ - <br />7 SOD FOR EXISTING YARD AREA SY 75 0.0 $ 5.00 $ - <br />8 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 8 $ 3,200.00 <br />PROJECT 9 - 62ND STREET <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 170 170.0 $ 10.00 $ 1,700.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.D $ 200.00 $ 400.00 <br />5 REGRADE DITCH LF 75 78.0 $ 25.00 $ 1,950.0D <br />6 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 9 $ 6,550.00 <br />PROJECT 10 - JAMES STREET <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 70 70.0 $ 10.00 $ 700.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 $ 200.00 $ 400.00 <br />5 REGRADE DITCH LF 30 30.0 $ 30.00 $ 900.00 <br />6 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 10 $ 3,500.00 <br />