Laserfiche WebLink
• <br />• <br />• <br />ESTIMATE NO. 3(f) <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14292.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: May 28, 2010 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 11 - DIANE STREET <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 50 50.0 $ 10.00 $ 500.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 $ 200.00 $ 400.00 <br />5 REGRADE DITCH LF 30 30.0 $ 30.00 $ 900.00 <br />6 SEED / RESTORATION LS 1 1.D $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 11 $ 3,300.00 <br />PROJECT 12 - COUNTRY LANE <br />1 MOBILIZATION <br />2 SALVAGE AND REINSTALL SPLIT RAIL FENCE <br />3 CLEAN /OPEN STORM SEWER OUTFALL <br />4 EXCAVATION AND GRADING <br />5 CLEAN STORM SEWER PIPE <br />6 SEED / RESTORATION <br />SUBTOTAL PROJECT 12 <br />SUBTOTAL ESTIMATE NO. 2 <br />LS 1 1.0 $ 500.00 $ 500.00 <br />LF 30 10.0 $ 10.00 $ 100.00 <br />EA 1 1.0 $ 500.00 $ 500.00 <br />CY 15 15.0 $ 70.00 $ 1,050.00 <br />LF 200 200.0 $ 10.00 $ 2,000.00 <br />LS 1 1.0 $ 500.00 $ 500.00 <br />$ 4,650.00 <br />CHANGE ORDE 2 +`NO 1, <br />v r �.. <br />..:.. ..._. ., .,fit.«: <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />2 CLEAN /OPEN STORM SEWER OUTFALL <br />5 REGRADE DITCH <br />SUBTOTAL PROJECT 4 <br />PROJECT 6 - APOLLO MEADOWS TOWNHOMES <br />9 CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />10 COMMON BORROW (FILL OVER PIPE) <br />SUBTOTAL PROJECT 6 <br />PROJECT 7 - LOIS LANE <br />10 CLEAN STORM SEWER PIPE <br />SUBTOTAL PROJECT 7 <br />$ 85.486.00 <br />EA 1 0.0 $ (500.00) $ <br />LF 150 0.0 $ (25.00) $ <br />$ <br />EA 2 2.0 $ 200.00 $ 400.00 <br />CY 48 48.0 $ 10.00 $ 480.00 <br />$ 880.00 <br />LF 50 50.0 $ 10.00 $ 500.00 <br />$ 500.00 <br />PROJECT 8 - BLACKBIRD LANE <br />9 EROSION CONTROL BLANKET CATEGORY 3 SY 60 60.0 $ 2.00 $ 120.00 <br />SUBTOTAL PROJECT 8 $ 120.00 <br />PROJECT 10 - JAMES STREET <br />7 CLASS III RIPRAP W/ FABRIC CY 2 2.0 $ 150.00 $ 300.00 <br />SUBTOTAL PROJECT 10 $ 300.00 <br />PROJECT 13 - BIRCH STREET TRENCH DRAIN <br />1 INSTALL TRENCH DRAIN IN CONCRETE LS 1 1.0 $ 4,500.00 $ 4,500.00 <br />2 CLASS II RIPRAP W/ FABRIC CY 5 5.0 $ 100.00 $ 500.00 <br />SUBTOTAL PROJECT 13 $ 5,000.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 6,800.00 <br />TOTAL ESTIMATE NO 3(f) $ 92,286.00 <br />