Laserfiche WebLink
• <br />• <br />• <br />AGENDA ITEM 6C <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: June 28, 2010 <br />TOPIC: Resolution No. 10 -56, Authorizing Preparation <br />of Plans and Specifications, 2010 Surface <br />Water Management Project. <br />Vote Required: Simple Majority <br />BACKGROUND: <br />After storm sewers, storm water ponds and drainage ways are constructed, they <br />require periodic maintenance to ensure their effectiveness. To maintain the <br />effectiveness of the storm sewer system, cleaning and repair of pipe sections, <br />catch basins, manholes, drainage ways and flared ends must be completed. <br />The City conducts yearly reviews of 20% of the City's MS4 outfalls, sediment <br />basins, storm sewers, and ponds to comply with NPDES requirements. We are <br />now in our 7th year which means our entire storm sewer pipe system has been <br />inspected and we have restarted on the area that was first inspected in 2005. <br />The 2010 Surface Water Management project will consist of the cleaning and <br />repair of the pipe sections, catch basins, manholes and flared ends and drainage <br />ways identified in the yearly NPDES reviews of storm sewers, public works <br />identified projects, and through resident issues. <br />The project schedule is as follows: <br />City Council Accepts Plans and Specifications July 26, 2010 <br />City Council Approves Request for Quotes July 26, 2010 <br />City Council Awards Contract August 23, 2010 <br />Construction Begins August, 2010 <br />RECOMMENDATION: <br />Staff recommends adoption of Resolution Number 10 -56 Authorizing Preparation <br />of Plans and Specifications, 2010 Surface Water Management Project. <br />