Laserfiche WebLink
• ' <br />TABULATION OF BIDS <br />2010 SURFACE WATER MANAGEMENT <br />STREET DRAINAGE IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14563.004 <br />BIDS OPENED: AUGUST 17, 2010, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ESTIMATE CW HOULE INC. <br />ITEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />TKDA <br />Fri 1114 ■i -ri III u V -i urx <br />,.,,,,., "m,.T,,,w„ ,*,,,g,„...p., <br />PENN CONTRACTING, INC. <br />UNIT TOTAL <br />PRICE AMOUNT <br />PROJECT B1 -1 and B1 -2 - 4TH AVENUE PIPE IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 700.00 <br />$ 700.00 <br />$ 1,250.00 <br />$ 1,250.00 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 650.00 <br />$ 650.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />3 <br />REMOVE BITUMINOUS PAVEMENT <br />150 <br />SY <br />$ 8.00 <br />$ 1,200.00 <br />$ 6.00 <br />$ 900.00 <br />$ 8.00 <br />$ 1,200.00 <br />4 <br />REMOVE STORM SEWER PIPE <br />75 <br />LF <br />$ 10.00 <br />$ 750.00 <br />$ 13.00 <br />$ 975.00 <br />$ 15.00 <br />$ 1,125.00 <br />5 <br />STORM MANHOLE, TYPE 409 <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 1,810.00 <br />$ 1,810.00 <br />$ 3,027.00 <br />$ 3,027.00 <br />6 <br />18" RCP (TIE AT ALL JOINTS) <br />80 <br />LF <br />$ 40.00 <br />$ 3,200.00 <br />$ 43.00 <br />$ 3,440.00 <br />$ 85.00 <br />$ 6,800.00 <br />7 <br />18" RCP APRON <br />1 <br />EA <br />$ 500.00 <br />$ 500.00 <br />$ 2,170.00 <br />$ 2,170.00 <br />$ 1,256.00 <br />$ 1,256.00 <br />8 <br />REMOVE /REPLACE 15" APRON <br />1 <br />EA <br />$ 200.00 <br />$ 200.00 <br />$ 2,030.00 <br />$ 2,030.00 <br />$ 1,044.00 <br />$ 1,044.00 <br />9 <br />CONSTRUCT DRAINAGE STRUCTURE - DESIGN 2 <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 4,075.00 <br />$ 4,075.00 <br />$ 3,138.00 <br />$ 3,138.00 <br />10 <br />TRENCH STABILIZATION / PIPE BEDDING <br />90 <br />LF <br />$ 25.00 <br />$ 2,250.00 <br />$ 8.00 <br />$ 720.00 <br />$ 5.00 <br />$ 450.00 <br />11 <br />SELECT GRANULAR BORROW ELL OVER PIPE) <br />AGGREGATE BASE CLASS 5 (6" DEPTH) <br />BITUMINOUS BASE COURSE 2360 (LVNW 35030) <br />200 <br />90 <br />20 <br />64 <br />CY <br />TN <br />TN <br />GAL <br />$ 2.00 <br />$ 18.00 <br />$ 60.00 <br />$ 20.00 <br />$ 400.00 <br />$ 1,620.00 <br />$ 1,200.00 <br />$ 1,280.00 <br />$ 17.00 <br />$ 21.00 <br />$ 93.00 <br />$ 5.00 <br />$ 3,400.00 <br />$ 1,890.00 <br />$ 1,860.00 <br />$ 320.00 <br />$ 15.00 <br />$ 30.00 <br />$ 132.00 <br />$ 0.10 <br />$ 3,000.00 <br />$ 2,700.00 <br />$ 2,640.00 <br />$ 6.40 <br />12 <br />13 <br />14 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />15 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />15 <br />TN <br />$ 75.00 <br />$ 1,125.00 <br />$ 110.00 <br />$ 1,650.00 <br />$ 150.00 <br />$ 2,250.00 <br />16 <br />CLASS III RIPRAP W/ FABRIC <br />10 <br />CY <br />$ 62.00 <br />$ 620.00 <br />$ 115.00 <br />$ 1,150.00 <br />$ 95.00 <br />$ 950.00 <br />17 <br />EROSION CONTROL BLANKET CATEGORY 3 <br />300 <br />SY <br />$ 2.50 <br />$ 750.00 <br />$ 3.00 <br />$ 900.00 <br />$ 2.70 <br />$ 810.00 <br />18 <br />SEED /RESTORATION <br />1 <br />LS <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,390.00 <br />$ 1,390.00 <br />$ 1,750.00 <br />$ 1,750.00 <br />19 <br />SOD FOR EXISTING YARD AREA <br />100 <br />SY <br />$ 4.00 <br />$ 400.00 <br />$ 8.00 <br />$ 800.00 <br />$ 5.50 <br />$ 550.00 <br />SUBTOTAL PROJECT B1 -1 and B1-2 <br />$ 29,995.00 <br />$ 30,830.00 <br />$ 34,946.40 <br />PROJECT B2 -1 - TIMBERWOLF TRAIL DRAINAGE <br />1 <br />MOBILIZATION <br />1.0 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 700.00 <br />$ 700.00 <br />$ 850.00 <br />$ 850.00 <br />2 <br />TRAFFIC CONTROL <br />1.0 <br />LS <br />$ 500.00 <br />$ 500.00 <br />$ 1,100.00 <br />$ 1,100.00 <br />$ 500.00 <br />$ 500.00 <br />3 <br />RECLAIM BITUMINOUS <br />800.0 <br />SY <br />$ 3.00 <br />$ 2,400.00 <br />$ 3.00 <br />$ 2,400.00 <br />$ 3.00 <br />$ 2,400.00 <br />4 <br />HAUL OUT EXCESS MILLINGSjLVJ <br />160.0 <br />460.0 <br />CY <br />LF <br />$ 2.95 <br />$ 3.00 <br />$ 472.00 <br />$ 1,380.00 <br />$ 11.00 <br />$ 5.00 <br />$ 1,760.00 <br />$ 2,300.00 <br />$ 10.00 <br />$ 5.00 <br />$ 1,600.00 <br />$ 2,300.00 <br />5 <br />REMOVE OF AND DISPOSE OF CONCRETE CURB <br />6 <br />BITUMINOUS BASE COURSE 2360 (LVNW 35030) <br />90.0 <br />40.0 <br />TN <br />GAL <br />$ 60.00 <br />$ 3.00 <br />$ 5,400.00 <br />$ 120.00 <br />$ 77.00 <br />$ 5.00 <br />$ 6,930.00 <br />$ 200.00 <br />$ 88.00 <br />$ 7.00 <br />$ 7,920.00 <br />$ 280.00 <br />7 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />8 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />70.0 <br />TN <br />$ 62.00 <br />$ 4,340.00 <br />$ 80.00 <br />$ 5,600.00 <br />$ 100.00 <br />$ 7,000.00 <br />9 <br />D412 CONCRETE CURB AND GUTTER <br />460.0 <br />LF <br />$ 13.00 <br />$ 5,980.00 <br />$ 13.00 <br />$ 5,980.00 <br />$ 14.50 <br />$ 6,670.00 <br />10 <br />SODDING AND TOPSOIL BORROW <br />30.0 <br />SY <br />$ 7.25 <br />$ 217.50 <br />$ 11.00 <br />$ 330.00 <br />$ 7.50 <br />$ 225.00 <br />11 <br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS <br />50.0 <br />LF <br />$ 4.00 <br />$ 200.00 <br />$ 9.00 <br />$ 450.00 <br />$ 4.00 <br />$ 200.00 <br />SUBTOTAL PROJECT B2 -1 <br />$ 26,009.50 <br />$ 27,750.00 <br />$ 29,945.00 <br />PROJECT B3-1 - OTTER LAKE TRAIL IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 850.00 <br />$ 850.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />70 <br />SY <br />$ 8.00 <br />$ 560.00 <br />$ 8.00 <br />$ 560.00 <br />$ 5.00 <br />$ 350.00 <br />3 <br />REMOVE /REPLACE RCP 51.12" x 31.31" ARCH APRON <br />1 <br />EA <br />$ 200.00 <br />$ 200.00 <br />$ 4,870.00 <br />$ 4,870.00 <br />$ 2,650.00 <br />$ 2,650.00 <br />4 <br />RCP 51.12" x 31.31" ARCH PIPE <br />16 <br />LF <br />$ 60.00 <br />$ 960.00 <br />$ 193.00 <br />$ 3,088.00 <br />$ 250.00 <br />$ 4,000.00 <br />5 <br />SELECT GRANULAR BORROWJFILL OVER PIPE) <br />AGGREGATE BASE CLASS 5 (6" DEPTH) <br />20 <br />20 <br />CY <br />TN <br />$ 20.00 <br />$ 20.00 <br />$ 400.00 <br />$ 400.00 <br />$ 20.00 <br />$ 23.00 <br />$ 400.00 <br />$ 460.00 <br />$ 35.00 <br />$ 55.00 <br />$ 700.00 <br />$ 1,100.00 <br />6 <br />7 <br />BITUMINOUS WEAR COURSE (2" DEPTH) <br />10 <br />TN <br />$ 65.00 <br />$ 650.00 <br />$ 150.00 <br />$ 1,500.00 <br />$ 200.00 <br />$ 2,000.00 <br />8 <br />EROSION CONTROL BLANKET CATEGORY 3 <br />200 <br />SY <br />$ 2.50 <br />$ 500.00 <br />$ 5.00 <br />$ 1,000.00 <br />$ 2.70 <br />$ 540.00 <br />9 <br />SEED / RESTORATION <br />1 <br />LS <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 800.00 <br />$ 800.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />SUBTOTAL PROJECT B3-1 <br />$ 10,170.00 <br />$ 14,178.00 <br />$ 13,690.00 <br />2010 STREET DRAINAGE IMPROVEMENTS TOTAL <br />$ 66,174.50 <br />$ 72,758.00 <br />$ 78,581.40 <br />Page 1 <br />