TABULATION OF BIDS II
<br />2010 SURFACE WATER MANAGEMENT
<br />STREET DRAINAGE IMPROVEMENTS
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA PROJECT NO. 14563.004
<br />BIDS OPENED: AUGUST 17, 2010, AT 10:00 AM
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />FOREST LAKE CONTRACTING
<br />ITEM UNIT TOTAL
<br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
<br />TKDA
<br />RII' -111 EF''IIG • fI 1 li E lI Its - P FN IIh:C
<br />n..404am..n..4.34..p..n...9ss......
<br />ARNT CONSTRUCTION CO., INC.
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />PROJECT B1.1 and B1 -2 -4TH AVENUE PIPE IMPROVEMENT
<br />1
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 4,500.00
<br />$ 4,500.00
<br />$ 3,800.00
<br />$ 3,800.00
<br />2
<br />TRAFFIC CONTROL
<br />1
<br />LS
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 1,400.00
<br />$ 1,400.00
<br />3
<br />REMOVE BITUMINOUS PAVEMENT
<br />150
<br />SY
<br />$ 4.00
<br />$ 600.00
<br />$ 3.00
<br />$ 450.00
<br />4
<br />REMOVE STORM SEWER PIPE
<br />75
<br />LF
<br />$ 13.00
<br />$ 975.00
<br />$ 12.00
<br />$ 900.00
<br />5
<br />STORM MANHOLE, TYPE 409
<br />1
<br />EA
<br />$ 2,500.00
<br />$ 2,500.00
<br />$ 1,900.00
<br />$ 1,900.00
<br />6
<br />18" RCP (TIE AT ALL JOINTS)
<br />80
<br />1
<br />LF
<br />EA
<br />$ 55.00
<br />$ 1,000.00
<br />$ 4,400.00
<br />$ 1,000.00
<br />$ 46.00
<br />$ 2,300.00
<br />$ 3,680.00
<br />$ 2,300.00
<br />7
<br />18" RCP APRON
<br />8
<br />REMOVE /REPLACE 15" APRON
<br />1
<br />EA
<br />$ 1,500.00
<br />$ 1,500.00
<br />$ 2,200.00
<br />$ 2,200.00
<br />9
<br />CONSTRUCT DRAINAGE STRUCTURE - DESIGN 2
<br />1
<br />EA
<br />$ 2,300.00
<br />$ 2,300.00
<br />$ 4,200.00
<br />$ 4,200.00
<br />10
<br />TRENCH STABILIZATION / PIPE BEDDING
<br />90
<br />LF
<br />$ 11.00
<br />$ 990.00
<br />$ 11.00
<br />$ 990.00
<br />11
<br />SELECT GRANULAR BORROW (FILL OVER PIPE)
<br />200
<br />90
<br />20
<br />64
<br />CY
<br />TN
<br />TN
<br />GAL
<br />$ 16.00
<br />$ 23.00
<br />$ 86.00
<br />$ 6.00
<br />$ 3,200.00
<br />$ 2,070.00
<br />$ 1,720.00
<br />$ 384.00
<br />$ 18.00
<br />$ 14.00
<br />$ 95.00
<br />$ 2.00
<br />$ 3,600.00
<br />$ 1,260.00
<br />$ 1,900.00
<br />$ 128.00
<br />12
<br />AGGREGATE BASE CLASS 5 (6" DEPTH)
<br />13
<br />BITUMINOUS BASE COURSE 2360 (LVNW 35030)
<br />14
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />15
<br />BITUMINOUS WEARING COURSE (LVWE 45030)
<br />15
<br />10
<br />TN
<br />CY
<br />$ 88.00
<br />$ 100.00
<br />$ 1,320.00
<br />$ 1,000.00
<br />$ 110.00
<br />$ 120.00
<br />$ 1,650.00
<br />$ 1,200.00
<br />16
<br />CLASS III RIPRAP W/ FABRIC
<br />17
<br />EROSION CONTROL BLANKET CATEGORY 3
<br />300
<br />SY
<br />$ 2.00
<br />$ 600.00
<br />$ 3.00
<br />$ 900.00
<br />18
<br />SEED / RESTORATION
<br />1
<br />LS
<br />$ 800.00
<br />$ 800.00
<br />$ 1,200.00
<br />$ 1,200.00
<br />19
<br />SOD FOR EXISTING YARD AREA
<br />100
<br />SY
<br />$ 6.00
<br />$ 600.00
<br />$ 6.00
<br />$ 600.00
<br />SUBTOTAL PROJECT B1 -1 and B1 -2
<br />$ 32,459.00
<br />$ 34,258.00
<br />PROJECT B2.1 - TIMBERWOLF TRAIL DRAINAGE
<br />1
<br />MOBILIZATION
<br />1.0
<br />LS
<br />$ 4,900.00
<br />$ 4,900.00
<br />$ 3,400.00
<br />$ 3,400.00
<br />2
<br />TRAFFIC CONTROL
<br />1.0
<br />LS
<br />$ 1,500.00
<br />$ 1,500.00
<br />$ 1,400.00
<br />$ 1,400.00
<br />3
<br />RECLAIM BITUMINOUS
<br />800.0
<br />SY
<br />$ 8.00
<br />$ 6,400.00
<br />$ 4.90
<br />$ 3,920.00
<br />4
<br />HAUL OUT EXCESS MILLINGSjLV)
<br />160.0
<br />460.0
<br />CY
<br />LF
<br />$ 0.01
<br />$ 5.00
<br />$ 1.60
<br />$ 2,300.00
<br />$ 8.00
<br />$ 2.00
<br />$ 1,280.00
<br />$ 920.00
<br />5
<br />REMOVE OF AND DISPOSE OF CONCRETE CURB
<br />6
<br />BITUMINOUS BASE COURSE 2360 (LVNW 35030)
<br />90.0
<br />40.0
<br />TN
<br />GAL
<br />$ 86.00
<br />$ 6.00
<br />$ 7,740.00
<br />$ 240.00
<br />$ 90.00
<br />$ 3.00
<br />$ 8,100.00
<br />$ 120.00
<br />7
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />8
<br />BITUMINOUS WEARING COURSE (LVWE 45030)
<br />70.0
<br />TN
<br />$ 88.00
<br />$ 6,160.00
<br />$ 110.00
<br />$ 7,700.00
<br />9
<br />D412 CONCRETE CURB AND GUTTER
<br />460.0
<br />LF
<br />$ 13.00
<br />$ 5,980.00
<br />$ 22.00
<br />$ 10,120.00
<br />*
<br />10
<br />SODDING AND TOPSOIL BORROW
<br />30.0
<br />SY
<br />$ 20.00
<br />$ 600.00
<br />$ 12.00
<br />$ 360.00
<br />11
<br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS
<br />50.0
<br />LF
<br />$ 5.00
<br />$ 250.00
<br />$ 6.00
<br />$ 300.00
<br />SUBTOTAL PROJECT B2-1
<br />$ 36,071.60
<br />$ 37,620.00
<br />PROJECT B3 -1 - OTTER LAKE TRAIL IM_ PROVEMENTS
<br />1
<br />LS
<br />$ 4,600.00
<br />$ 4,600.00
<br />$ 1,800.00
<br />$ 1,800.00
<br />1
<br />MOBILIZATION
<br />2
<br />REMOVE BITUMINOUS PAVEMENT
<br />70
<br />SY
<br />$ 5.00
<br />$ 350.00
<br />$ 4.00
<br />$ 280.00
<br />3
<br />REMOVE /REPLACE RCP 51.12" x 31.31" ARCH APRON
<br />1
<br />EA
<br />$ 1,800.00
<br />$ 1,800.00
<br />$ 5,900.00
<br />$ 5,900.00
<br />4
<br />RCP 51.12" x 31.31" ARCH PIPE
<br />16
<br />LF
<br />$ 275.00
<br />$ 4,400.00
<br />$ 204.00
<br />$ 3,264.00
<br />5
<br />SELECT GRANULAR BORROW (FILL OVER PIPE)
<br />20
<br />20
<br />CY
<br />TN
<br />$ 32.00
<br />$ 30.00
<br />$ 640.00
<br />$ 600.00
<br />$ 28.00
<br />$ 16.00
<br />$ 560.00
<br />$ 320.00
<br />6
<br />AGGREGATE BASE CLASS 5 (6" DEPTH)
<br />7
<br />BITUMINOUS WEAR COURSE (2" DEPTH)
<br />10
<br />TN
<br />$ 88.00
<br />$ 880.00
<br />$ 148.00
<br />$ 1,480.00
<br />8
<br />EROSION CONTROL BLANKET CATEGORY 3
<br />200
<br />SY
<br />$ 2.00
<br />$ 400.00
<br />$ 4.00
<br />$ 800.00
<br />9
<br />SEED / RESTORATION
<br />1
<br />LS
<br />$ 1,600.00
<br />$ 1,600.00
<br />$ 1,200.00
<br />$ 1,200.00
<br />SUBTOTAL PROJECT B3 -1
<br />$ 15,270.00
<br />$ 15,604.00
<br />2010 STREET DRAINAGE IMPROVEMENTS TOTAL
<br />$ 83,800.60
<br />$ 87,482.00