Laserfiche WebLink
TABULATION OF BIDS II <br />2010 SURFACE WATER MANAGEMENT <br />STREET DRAINAGE IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14563.004 <br />BIDS OPENED: AUGUST 17, 2010, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />FOREST LAKE CONTRACTING <br />ITEM UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br />TKDA <br />RII' -111 EF''IIG • fI 1 li E lI Its - P FN IIh:C <br />n..404am..n..4.34..p..n...9ss...... <br />ARNT CONSTRUCTION CO., INC. <br />UNIT TOTAL <br />PRICE AMOUNT <br />PROJECT B1.1 and B1 -2 -4TH AVENUE PIPE IMPROVEMENT <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 4,500.00 <br />$ 4,500.00 <br />$ 3,800.00 <br />$ 3,800.00 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,400.00 <br />$ 1,400.00 <br />3 <br />REMOVE BITUMINOUS PAVEMENT <br />150 <br />SY <br />$ 4.00 <br />$ 600.00 <br />$ 3.00 <br />$ 450.00 <br />4 <br />REMOVE STORM SEWER PIPE <br />75 <br />LF <br />$ 13.00 <br />$ 975.00 <br />$ 12.00 <br />$ 900.00 <br />5 <br />STORM MANHOLE, TYPE 409 <br />1 <br />EA <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 1,900.00 <br />$ 1,900.00 <br />6 <br />18" RCP (TIE AT ALL JOINTS) <br />80 <br />1 <br />LF <br />EA <br />$ 55.00 <br />$ 1,000.00 <br />$ 4,400.00 <br />$ 1,000.00 <br />$ 46.00 <br />$ 2,300.00 <br />$ 3,680.00 <br />$ 2,300.00 <br />7 <br />18" RCP APRON <br />8 <br />REMOVE /REPLACE 15" APRON <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 2,200.00 <br />$ 2,200.00 <br />9 <br />CONSTRUCT DRAINAGE STRUCTURE - DESIGN 2 <br />1 <br />EA <br />$ 2,300.00 <br />$ 2,300.00 <br />$ 4,200.00 <br />$ 4,200.00 <br />10 <br />TRENCH STABILIZATION / PIPE BEDDING <br />90 <br />LF <br />$ 11.00 <br />$ 990.00 <br />$ 11.00 <br />$ 990.00 <br />11 <br />SELECT GRANULAR BORROW (FILL OVER PIPE) <br />200 <br />90 <br />20 <br />64 <br />CY <br />TN <br />TN <br />GAL <br />$ 16.00 <br />$ 23.00 <br />$ 86.00 <br />$ 6.00 <br />$ 3,200.00 <br />$ 2,070.00 <br />$ 1,720.00 <br />$ 384.00 <br />$ 18.00 <br />$ 14.00 <br />$ 95.00 <br />$ 2.00 <br />$ 3,600.00 <br />$ 1,260.00 <br />$ 1,900.00 <br />$ 128.00 <br />12 <br />AGGREGATE BASE CLASS 5 (6" DEPTH) <br />13 <br />BITUMINOUS BASE COURSE 2360 (LVNW 35030) <br />14 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />15 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />15 <br />10 <br />TN <br />CY <br />$ 88.00 <br />$ 100.00 <br />$ 1,320.00 <br />$ 1,000.00 <br />$ 110.00 <br />$ 120.00 <br />$ 1,650.00 <br />$ 1,200.00 <br />16 <br />CLASS III RIPRAP W/ FABRIC <br />17 <br />EROSION CONTROL BLANKET CATEGORY 3 <br />300 <br />SY <br />$ 2.00 <br />$ 600.00 <br />$ 3.00 <br />$ 900.00 <br />18 <br />SEED / RESTORATION <br />1 <br />LS <br />$ 800.00 <br />$ 800.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />19 <br />SOD FOR EXISTING YARD AREA <br />100 <br />SY <br />$ 6.00 <br />$ 600.00 <br />$ 6.00 <br />$ 600.00 <br />SUBTOTAL PROJECT B1 -1 and B1 -2 <br />$ 32,459.00 <br />$ 34,258.00 <br />PROJECT B2.1 - TIMBERWOLF TRAIL DRAINAGE <br />1 <br />MOBILIZATION <br />1.0 <br />LS <br />$ 4,900.00 <br />$ 4,900.00 <br />$ 3,400.00 <br />$ 3,400.00 <br />2 <br />TRAFFIC CONTROL <br />1.0 <br />LS <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,400.00 <br />$ 1,400.00 <br />3 <br />RECLAIM BITUMINOUS <br />800.0 <br />SY <br />$ 8.00 <br />$ 6,400.00 <br />$ 4.90 <br />$ 3,920.00 <br />4 <br />HAUL OUT EXCESS MILLINGSjLV) <br />160.0 <br />460.0 <br />CY <br />LF <br />$ 0.01 <br />$ 5.00 <br />$ 1.60 <br />$ 2,300.00 <br />$ 8.00 <br />$ 2.00 <br />$ 1,280.00 <br />$ 920.00 <br />5 <br />REMOVE OF AND DISPOSE OF CONCRETE CURB <br />6 <br />BITUMINOUS BASE COURSE 2360 (LVNW 35030) <br />90.0 <br />40.0 <br />TN <br />GAL <br />$ 86.00 <br />$ 6.00 <br />$ 7,740.00 <br />$ 240.00 <br />$ 90.00 <br />$ 3.00 <br />$ 8,100.00 <br />$ 120.00 <br />7 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />8 <br />BITUMINOUS WEARING COURSE (LVWE 45030) <br />70.0 <br />TN <br />$ 88.00 <br />$ 6,160.00 <br />$ 110.00 <br />$ 7,700.00 <br />9 <br />D412 CONCRETE CURB AND GUTTER <br />460.0 <br />LF <br />$ 13.00 <br />$ 5,980.00 <br />$ 22.00 <br />$ 10,120.00 <br />* <br />10 <br />SODDING AND TOPSOIL BORROW <br />30.0 <br />SY <br />$ 20.00 <br />$ 600.00 <br />$ 12.00 <br />$ 360.00 <br />11 <br />BIODEGRADABLE FIBER EROSION CONTROL ROLLS <br />50.0 <br />LF <br />$ 5.00 <br />$ 250.00 <br />$ 6.00 <br />$ 300.00 <br />SUBTOTAL PROJECT B2-1 <br />$ 36,071.60 <br />$ 37,620.00 <br />PROJECT B3 -1 - OTTER LAKE TRAIL IM_ PROVEMENTS <br />1 <br />LS <br />$ 4,600.00 <br />$ 4,600.00 <br />$ 1,800.00 <br />$ 1,800.00 <br />1 <br />MOBILIZATION <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />70 <br />SY <br />$ 5.00 <br />$ 350.00 <br />$ 4.00 <br />$ 280.00 <br />3 <br />REMOVE /REPLACE RCP 51.12" x 31.31" ARCH APRON <br />1 <br />EA <br />$ 1,800.00 <br />$ 1,800.00 <br />$ 5,900.00 <br />$ 5,900.00 <br />4 <br />RCP 51.12" x 31.31" ARCH PIPE <br />16 <br />LF <br />$ 275.00 <br />$ 4,400.00 <br />$ 204.00 <br />$ 3,264.00 <br />5 <br />SELECT GRANULAR BORROW (FILL OVER PIPE) <br />20 <br />20 <br />CY <br />TN <br />$ 32.00 <br />$ 30.00 <br />$ 640.00 <br />$ 600.00 <br />$ 28.00 <br />$ 16.00 <br />$ 560.00 <br />$ 320.00 <br />6 <br />AGGREGATE BASE CLASS 5 (6" DEPTH) <br />7 <br />BITUMINOUS WEAR COURSE (2" DEPTH) <br />10 <br />TN <br />$ 88.00 <br />$ 880.00 <br />$ 148.00 <br />$ 1,480.00 <br />8 <br />EROSION CONTROL BLANKET CATEGORY 3 <br />200 <br />SY <br />$ 2.00 <br />$ 400.00 <br />$ 4.00 <br />$ 800.00 <br />9 <br />SEED / RESTORATION <br />1 <br />LS <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />SUBTOTAL PROJECT B3 -1 <br />$ 15,270.00 <br />$ 15,604.00 <br />2010 STREET DRAINAGE IMPROVEMENTS TOTAL <br />$ 83,800.60 <br />$ 87,482.00 <br />• <br />Page 2 <br />