Laserfiche WebLink
Streets: Stage Coach Trail is already in place for the majority of the site and will be <br />connected fully with the Grandview project to the south. A sidewalk is shown on the east side of <br />the street within the right of way. This must be continued to the southern boundary of the plat. <br />Conservation Easement: A Conservation Easement was supplied by the developer for <br />Marshan Meadows and will govern the development of both of these lots. <br />Park Dedication: There is no land dedication needed, as Marshan Park is nearby, so the <br />typical park dedication fee will be collected with the Development Agreement. <br />Utilities: Sanitary sewer and water are located within Stage Coach Trail and both lots will <br />be required to connect. The drainage and utility easement indicated on the south property line of <br />Lot 2, Block 1 is depicted at 10 feet in width. This is in excess of what is needed for the city, <br />which is 5 feet in width. This reduction may allow the developer to shift garage footprint closer <br />to the property line thereby increasing the building area on the lot. This must be changed prior to <br />the city signing and releasing the final plat mylar for the project. <br />Grading: The grading plan has been reviewed by the City Engineer and his comments will <br />need to be addressed to his satisfaction prior to the site being developed. The grading plan <br />acknowledges the Grandview project that was approved by the city earlier this year, and the two <br />developers are cooperating to guarantee that both projects work seamlessly together. <br />Planning and Zoning Board: At the December 12, 2007 regular meeting the board voted <br />unanimously to recommend approval of the project based on the conditions provided by staff. <br />• DEVELOPMENT AGREEMENT <br />The Marshan Meadows 2nd Addition is a lot spilt of Lot 1 Block 1 of the Marshan Meadows <br />Addition. The lot splitting will create two parcels that already have sanitary sewer, storm sewer, <br />street and watermain improvements available to them. One parcel has been assessed with the <br />Marshan Meadows Project and the newly split parcel will be assessed within the attached <br />Marshan Meadows 2nd Addition development contract. This lot spilt was made possible by the <br />construction of the Grandview project. <br />In accordance with the preliminary plat approval and City policy, staff has prepared a <br />Development Contract. The contract provides for the following: <br />1. Submittal by the developer of a Letter of Credit in the amount of $2,200.00 representing <br />35 percent of the City improvement costs to insure completion of the project in <br />accordance with the approved plans. <br />2. Deposit of a cash escrow in the amount of $3,800 to reimburse the City for costs incurred <br />by the City related to the development and improvements of the site. <br />Bruggeman Properties, LLC. has reviewed the contract and is aware of the conditions set forth. <br />• <br />