My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
09/10/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:36:43 PM
Creation date
9/8/2014 8:38:22 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/10/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />September 4, 2014 <br />Page 2 <br />■ Revise the curve numbers based on RCWD Rule C values (HSG B is 61 for existing pervious <br />areas). <br />■ Please include the 7.2-inch 100-year 10-day snowmelt event to determine critical water <br />surface elevation. <br />■ Ponds PDI and PD2 do not have an outlet, how will water drain from the ponds? <br />2. Grading and Erosion Control Plan <br />■ There are two ponds labeled as P 1 <br />■ Label pond types (ex. detention basin, infiltration basin ,etc) <br />■ Unable to determine if freeboard requirements have been met without more information on <br />the types of ponds being proposed. <br />■ Pond outlet structures as specified in the HydroCAD model not shown on plan, nor do the <br />elevations match the plans, please clarify <br />■ Do not see erosion control features on plan, please verify <br />■ High water level for the pond in catchments P4 and P5 do not match HydroCAD results <br />(906.69, and 906.88, respectively) <br />■ Pond 3 normal water level is below the pond bottom elevation <br />Post -Development Drainage Plan: <br />■ There are two ponds labeled as P 1 <br />■ Label pond types (ex. detention basin, infiltration basin ,etc) <br />■ Pond outlet structures as specified in the HydroCAD model not shown on plan, nor do the <br />elevations match the plans, please clarify <br />■ High water level for the pond in catchments P4 and P5 do not match HydroCAD results <br />(906.69, and 906.88, respectively) <br />■ Pond 3 normal water level is below the pond bottom elevation <br />4. Administrative: <br />■ The applicant must provide an operation and maintenance agreement for stormwater <br />facilities. This agreement must be recorded against the parcel so that it transfers with future <br />sales of the parcel. This may be included as a part of the Developer's agreement with the <br />City. <br />■ The applicant must receive permits from other agencies prior to construction. Permits needed <br />may include the MPCA's NPDES Construction Stormwater Permit and RCWD's Stormwater <br />Management and Erosion Control permits. <br />Grading Comments: <br />Benchmark or datum not shown on grading plan, please specify NGVD29 or NAVD88 for <br />the vertical datum. <br />Utility Plan: <br />1. Label exiting utilities (8" PVC sanitary, 8" DIP watermain. <br />2. The east sanitary MH in Arlo Ln is mislabeled. <br />3. Provide a detail of the proposed pump station. <br />This concludes our plan review comments at this time. If you, or the applicant, have any <br />questions regarding these comments, please contact me at (612) 360-1298 or <br />dhankee@wsbeng.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.