My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-060 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2011
>
2011-060 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 11:09:59 AM
Creation date
9/8/2014 2:10:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
06/27/2011
Council Meeting Type
Regular
Resolution #
11-60
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />AGENDA ITEM 6D <br />STAFF ORIGINATOR: Paul Bengtson <br />CC MEETING DATE: June 27, 2011 <br />TOPIC: Temporary Batch Plant — 2209 Phelps Road <br />Consider Resolution No. 11 -60, approving an <br />Interim Use Permit for a Temporary Batch Plant at <br />2209 Phelps Road. <br />ii. Consider Resolution No. 11 -68, authorizing <br />execution of Performance Agreement. <br />Background <br />Arnt Construction has applied to amend the Zoning Ordinance to add Temporary Batch <br />Plants as an Interim Use and to approve an Interim Use Permit for a Temporary Batch <br />Plant at 2209 Phelps Road. The Temporary Batch Plant is intended to serve the 135E <br />road construction project. <br />In reviewing an application for an Interim Use Permit, the city must consider the general <br />• standards included in the conditional use permit section (Section 2.Subd.2) of the <br />zoning ordinance and any specific conditions within the ordinance for the use proposed. <br />Interim /Conditional Use Permit general standards <br />Staff has reviewed the application versus the general standards included in Section <br />2.Subdivision 2 of the Zoning Ordinance and has included findings in Resolution <br />Number 11 -60 that support approval of the proposed use on this site. <br />Interim Use Permit standards — Temporary Batch Plant <br />The performance standards specific to the Temporary Batch Plant included in <br />Ordinance 13 -11 are: <br />1) The Batch Plant shall be located on the site so as to minimize the disturbance of <br />surrounding dwelling units or commercial businesses. <br />The proposed site is surrounded by Light Industrial properties and is a <br />substantial distance from any dwelling units and commercial businesses. <br />2) The Batch Plant shall maintain a 50 foot setback from any wetland. <br />The site does not have any wetlands within 50 feet of the proposed area of <br />disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.