My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-095 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2011
>
2011-095 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 1:12:10 PM
Creation date
9/9/2014 9:52:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
10/10/2011
Council Meeting Type
Regular
Resolution #
11-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contractors who are to do the Work. Said cost estimates shall be reviewed <br /> by the City,,and the City shall establish the actual amount of the financial <br /> guarantee. The description and estimated cost of Developer's On-site <br /> Work is as follows: <br /> Description of Improvements Estimated Costs <br /> 1 Storm Drainage Systems/Sewers/Culverts/ $4,100.00 <br /> Swales <br /> 2 Driveway/Parking Lot/Fire Lane $ 13,350.00 <br /> 3 Landscaping $7,100.00 <br /> 4 Site Grading $9,200.00 <br /> 5 Erosion Control $ 1,175.00 <br /> Total Estimated Cost of Developer Improvements 11 $ 34,925.00 <br /> Security Requirement(Total * 35%) $ 12,225.00 <br /> III. OFF-SITE WORK <br /> A. Off-site Work. The Developer shall design and install, at the Developer's <br /> Expense,certain Off-site Work as follows: <br /> • As listed in paragraph III. F. <br /> Such improvements shall be completed in accordance with Section IV <br /> herein. <br /> B. Right=of-Way. The Developer shall be responsible for acquiring any <br /> right-of-way,temporary easements, or permanent easements necessary for <br /> the making of such improvements. <br /> C. Plans& S2ecifications. The Developer shall prepare plans and <br /> specifications for the making of such improvements. Said plans and <br /> specifications shall be subject to review and approval by the City of Lino <br /> Lakes and Anoka County. <br /> D. Construction Observation. The Developer shall instruct its engineer to <br /> provide adequate field inspection personnel to assure an acceptable level <br /> of quality control to the extent that the Developer's engineer will be able to <br /> certify that the construction work meets the approved City and County <br /> standards as a condition of City/County acceptance. In addition,the City <br /> and/or County may have an inspector inspect the work on a part-time <br /> basis. <br /> E. Record Plans. Within thirty(30) days after the completion of the <br /> improvements the Developer shall supply the City with a complete set of <br /> page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.