My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-095 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2011
>
2011-095 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 1:12:10 PM
Creation date
9/9/2014 9:52:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
10/10/2011
Council Meeting Type
Regular
Resolution #
11-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reproducible mylar"Record drawings, and two complete sets of paper ' <br /> copy"Record" drawings, all prepared in accordance with City standards. <br /> An electronic copy of the plans shall also be submitted in an AutoCAD <br /> DWG format. <br /> F. Cost Estimates. The Developer shall provide the City with a written <br /> estimate of all applicable costs of the Off-Site Work, itemized by type;the <br /> estimates shall be based upon the actual estimates provided by the <br /> contractors who are to do the Work. Said cost estimates shall be reviewed <br /> by the City, and the City shall establish the actual amount of the financial <br /> guarantee. The Description of and estimated Costs of Developer's Off- <br /> Site Work is as follows: <br /> Description of Improvements Estimated Costs <br /> 1 Excavation, construction,restoration for $4,460.00 <br /> driveway/access within Lake Drive right of way <br /> and Main Street right of way <br /> Total Estimated Cost of Developer Off-Site Work $4,460.00 <br /> Security Requirement(Total* 35%) $ 1,560 <br /> IV. COMPLETION DATE. • <br /> The activities authorized by site and building plan approval shall be initiated within <br /> six(6)months after the date of execution of this Agreement unless extension is <br /> granted by the City. If such activity is not completed within eighteen(18)months, <br /> the City may exercise any remedies as set forth in Section VII.,unless an extension <br /> is granted by the City. <br /> V. GUA]2ANTEE. <br /> A. The Developer will fully and faithfully comply with all terms and <br /> conditions of any and all contracts entered into by the Developer for the <br /> installation and construction of all Developer's Work and hereby <br /> j guarantees the workmanship and materials for a period of one year <br /> following the City's final acceptance of the Developer's Work. <br /> Concurrently with the execution hereof by the Developer,the Developer <br /> will furnish to,and at all times thereafter maintain with the City,a cash <br /> deposit, certified check, or Irrevocable Letter of Credit,based on thirty- <br /> five(35%)percent of the total estimated cost of Developer's Work. An <br /> Irrevocable Letter of Credit shall be for the exclusive use and benefit of <br /> the City of Lino Lakes and shall state thereon that the same is issued to <br /> guarantee and assure performance by the Developer of all the terms and <br /> conditions of this Development Contract and construction of all required <br /> improvements in accordance with the ordinances and specifications of the . <br /> page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.