My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-027 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-027 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 12:27:51 PM
Creation date
9/10/2014 11:22:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/14/2005
Council Meeting Type
Regular
Resolution #
05-27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo Page 6 February 3, 2005 <br />Century Farms North 3rd Addition <br />Engineering Review <br />• <br />• <br />d.) As has been noted in the street section, catch basins shall be set five (5) feet beyond on the <br />radius point and along the tangent at street intersections. <br />e.) Catch basin 170 on Century Trail shall be changed to a Type 402. Catch basin 175 on <br />Robinson Drive shall be changed to a Type 402. (See Plan Sheet U11) <br />f.) Backyard catch basins 184, 185, and 186 all have the same invert. Also, the inlet structure <br />castings shall be Type 402A. (See Plan Sheet U12) <br />g.) Standard Details (Plan Sheet D1): <br />• Outlet Structure 166: This structure is not labeled in the plans. Thus, either delete the <br />detail if not to be used on this project or identify/label its location in the plan set. <br />• Outlet Structure 142: The shown 4" orifice to Pond K will not be allowed due to <br />potential clogging with debris. A recommended alternative would be a submerged <br />reverse flow 15" RCP with a 4" orifice plate attached to the inside of the pipe /manhole <br />interface. <br />7. Miscellaneous Items: <br />110 a.) The City Engineer reserves the authority to increase and add testing methods to protect and <br />verify compliance of construction materials and installation methods to protect its interests. <br />b.) Provide the City Engineer with a copy of the project `Engineer's Estimate' or actual <br />construction costs. <br />c.) Provide a copy of the project specifications for review. <br />d.) Final construction plans and specifications must be approved by the City Engineer prior to <br />construction commencement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.