Laserfiche WebLink
Memo Page 5 February 3, 2005 <br />Century Farms North 3rd Addition <br />Engineering Review <br />41) <br />f.) Catch basin locations at the end/beginning of street curbline radii are to be set at five (5) feet <br />beyond the radius points on the tangent. Catch basins 172, 173, 174, 175, and 180 appear to <br />need to be moved to attain this requirement. <br />g.) Add a set of Type II Barricades on Robinson Drive and to the west of Shetland Lane. (Plan <br />Sheet U6) <br />h.) The proposed temporary cul -de -sac at the east end of Carl Street has a radius of 35 feet. The <br />City of Lino Lakes requires a minimum of a 46 foot radius for cul -de- sac(s). Adjust the radius <br />of the cul -de -sac and show clearly how the storm runoff from the cul -de -sac will flow. <br />i.) Make sure all the proposed profile street centerline grades are shown on the plan sheets. <br />j.) There shall be a minimum five (5) foot separation between the proposed driveway and the <br />existing catch basin 132 on Clydesdale Circle. (Plan Sheet U8) <br />k.) The following street vertical curves shall be modified: <br />• Century Trail at approximately Station 34 +30 - change from 50 -foot length to 90 -foot <br />length vertical crest curve for 30 mph rating. <br />• Delete vertical curve and have low point at approximately Station 36 +78 on Century <br />Trail. <br />• On Clydesdale Circle at approximately Station 2 +00 - change from 50 -foot length to <br />90 -foot length vertical crest curve for 30 mph rating. <br />1.) Typical Section Details: <br />• Change the bituminous mixture designation from Type B (PG 58 - 28) to Type C <br />(PG 58 -34). <br />• 24" Granular Materials shall be "Select Granular Borrow" matching the requirements <br />for Mn/DOT 3149.232. <br />6. Storm Sewer System Items: <br />a.) Provide the City Engineer with copies of the Rice Creek Watershed District permit along with <br />NPDES /SWPPP permits for review /approval prior to construction commencement. <br />b.) Provide the City Engineer with a statement of compliance that the storm sewer system <br />proposed for Century Farms North 3rd Addition adheres to the overall storm sewer system <br />previously approved for the Century Farms North total development site. If there are changes, <br />revised storm system calculations are necessary to submit for review. <br />c.) Provide to the City Engineer a copy of the storm sewer piping system calculations for review <br />and approval (pipe capacity for 5 -year Storm Design Event). <br />