<br />TABULATION OF BIDS
<br />CONSTRUCTION OF WELL NO. 5
<br />CITY OF LINO LAKES, MINNESOTA
<br />COMMISSION NO. 13089-01
<br />BIDS OPENED: MARCH z9,00nSAT1u:0oAm
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />TEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />ENGINEER'S ESTIMATE
<br />UNIT TOTAL
<br />UNIT PRICE AMOUNT
<br />EH RENNER & SONS
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />•
<br />TKDA
<br />BERGERSON-CASWELL
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />CONSTRUCTION OF NO. s_
<br />The moving of alt drilting equipment and malerials Onto the site,
<br />setting up the equipment, removal of equtpment. and clean-up of the
<br />site upon completion oF Ihe Work, togother with alt items of
<br />constuction and testing excepl for those ilernlzed separately below.
<br />2 The furnishing, installation, and maintenance of erosion controls.
<br />The drilling by cable tool methods of 24-inch diameter cased hole
<br />3 through the glacia drift formation and to refusal, o"maximum 10
<br />feet, into the bedrock, including materials.
<br />The drilling by cable tool methods of 23-inch diameter open hole
<br />through the Prairie du Chien-Jordan formations.
<br />The furnishing and installing complete of 18-Inch inner casing as
<br />specified.
<br />Fumlshing and placing of pea into the open hole
<br />prior to grouting, arid removal and disposab once grouting is
<br />complete. and placing oE neat cement Eor grouting the arinular
<br />��Uwm�hv�unudm��nnau��
<br />7 vvuc»o�oenumvoo�on
<br />casing.
<br />8 Furnish, place, and shoot the rod( formation with explosives.
<br />Remove from the well rock loosened by explosives or air surging,
<br />and measuring this rock in an approved measuring box.
<br />For moving 750 CFM or larger air compressor onto site, setting up
<br />10 equipment for air surging, and removal v, air compressor from site
<br />pon completion of work.
<br />11 For air surging to develop the Formation.
<br />For installing and removing air compressor, piping, and appurtenant
<br />/u
<br />equipment for eunx.eumnono| air surging required.
<br />Furnish and install in Ihe welt a tesi pump capabte of delivering
<br />c.mmnpmm water from the well, and remove from the well once
<br />/» lest pumping is complete, including rurnisliing sufficient dlscharge
<br />piping and power for operating the test punip.
<br />14 For well testing for yield, u,ommvwn.andlecoverY.____
<br />For installiiig and removing from the well the test pump. piping, alt
<br />15 appurtenant equipment and power for operating Ihe test pump for
<br />each additional yield, drawdown, and recovery lest as required.
<br />.o
<br />6
<br />7
<br />LS
<br />$ 19,202.50
<br />$ 19,202.50
<br />$ 21,000.00
<br />21,000.00
<br />$ 20,000.00
<br />400 LF $ 5.78 $ 2,310.00
<br />70 LF * 247.50 $ 17,325.00
<br />5.00
<br />215.00
<br />$ 2,000.00
<br />$ 15,050.00
<br />5.00
<br />225.00
<br />$
<br />20,000.00
<br />215 LF * 126.50 $ 27,197o0
<br />150 LF 88.00 $ 13,200.00
<br />60 TN y 77.00 $ 4.620.00
<br />115.00
<br />$ 24,725.00
<br />80.00
<br />$ 12,000.00
<br />200.00 $ 43,000.00
<br />85.00 $ 12,750.00
<br />50.00
<br />$ 3,000.00
<br />320.00
<br />$ 6,400.00
<br />200 LB 20.63 $ 4,125.00
<br />500 CY 77.00 $ 38,500.00
<br />LS $ 5,500.00 $ 5,500.00
<br />25.00
<br />60.00
<br />$ 8,000.00
<br />For sand content Tests, as required, includlng tIie taking of the
<br />sample, delivery and testing of the sample and reporting the results.
<br />The collection and analysis of the well water by a qualified approved
<br />taborabory for testing as specified. and preparation of a report.
<br />80. HR $ 192.50 $ 15,400.00
<br />1 LS $ 1.100o0 $ 1.100.00
<br />LS 4,950.00 4,950.00
<br />$ 5,000.00
<br />$ 30,000.00
<br />$ 8,000.00
<br />200.00 $ 16,000.00
<br />500.00
<br />500.00
<br />120.00
<br />360.00
<br />$ 7,200.00
<br />25.06- 5/00.00 _
<br />85.00
<br />5,500.00
<br />$ 42,500.00
<br />$ 5,500.00
<br />165.00 $ 13,200o0
<br />1,000.00 $ 1,000.00
<br />$ 5,000.00
<br />60 HR $ 137.50 8,250o0
<br />�
<br />LS $ 1.375.00 m 1.375.00
<br />a
<br />LS m 55.00 $ 275.00
<br />LS $ 1,100.00 $ 1,100.00
<br />110.00
<br />500.00
<br />$ 5,000.00
<br />$ 6,600.00
<br />10.00
<br />$ 1,100.00
<br />�
<br />500.00
<br />50.00
<br />$ 1,100.00
<br />6,500o0 $ 6,500.00
<br />1400n$
<br />1,000.00 $ 1,000o0
<br />50.00
<br />1,250.00
<br />� 250.00
<br />$ 1,250.00
<br />Page 1