My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-195 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-195 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2014 1:40:12 PM
Creation date
9/15/2014 1:06:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
12/12/2005
Council Meeting Type
Regular
Resolution #
05-195
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 6Ei <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: December 12, 2005 <br />TOPIC: Resolution No. 05 — 195, Ordering Improvements and Preparation of <br />Plans and Specifications, Lois Lane Utility Extension <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />The residents along Lois Lane petitioned for the extension of sanitary sewer and water <br />along Lois Lane. A feasibility study for this proposed project was prepared by TKDA <br />and received at the July 25th, 2005 City Council Meeting. This study revealed a total <br />project cost of $395,762.50. The project will be 100% assessed to the benefiting <br />properties. <br />It was decided at the November 22, 2005 City Council Work Session to defer all future <br />lot assessments. Therefore, the project will be funded partially by special assessments, <br />and all deferred lot assessments will be funded by the Trunk Area and Unit Fund. <br />When the future lots are created, they will be assessed at that time. <br />The schedule for this project is as follows: <br />Authorize Plans and Specifications <br />Approve Plans /Specifications and Authorize Ad for Bids <br />Call for Hearing and Declare Cost to be Assessed <br />Hold Hearing and Award Contract <br />Construction Begins <br />December 12, 2005 <br />March, 2006 <br />April, 2006 <br />May, 2006 <br />June, 2006 <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 05 — 195 Ordering Improvements and Preparation of <br />Plans and Specifications for the Lois Lane Utility Extension. <br />3. Not adopt Resolution No. 05 — 195. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution Number 05 — 195 be adopted. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.