My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-015 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-015 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2014 2:46:15 PM
Creation date
9/15/2014 3:50:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/13/2006
Council Meeting Type
Regular
Resolution #
06-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: <br />Copies To: <br />James E. Studenski, P.E. <br />1500 Piper Jattray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Reference: Pomps Tire <br />Site Plan Review <br />City of Lino Lakes, Minnesota <br />From: Thomas Prew, P.E. Proj. No.: 13265.002 <br />Date: February 2, 2006 Routing: <br />The following review is based on these submittals: <br />1. Midstates Tire and Tool, Inc. Utility Plan prepared by Metro Land Surveying & Engineering, dated <br />January 4, 2006. <br />2. Midstates Tire and Tool, Inc. Grading Plan prepared by Metro Land Surveying & Engineering, dated <br />November 2, 2006.. <br />Streets <br />1. Previous comments regarding the street have been addressed. <br />Sanitary Sewer <br />1. The developer will provide as -built records for the sanitary sewer that crosses this property. All other <br />comments have been addressed <br />Watermain <br />1. Previous comments regarding the watermain have been addressed. <br />Drainage and Storm Sewer <br />1. A memo on the drainage and storm sewer was completed on January 23, 2006 (see attached). The <br />drainage plan and the storm sewer plan should be re- submitted with those comments addressed. <br />Miscellaneous <br />1. Construction Record Drawings (As- Builts) must be submitted once all improvements have been <br />completed. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.