My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-015 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-015 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2014 2:46:15 PM
Creation date
9/15/2014 3:50:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/13/2006
Council Meeting Type
Regular
Resolution #
06-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />• <br />MEMORANDUM <br />To: <br />Copies To: <br />James E. Studenski, P.E. <br />From: Connie J. Taillon, P.E. <br />Date: January 23, 2006 <br />Reference: Pomps Tire <br />Proj. No.: <br />Routing: <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.co.m <br />Drainage Review <br />City of Lino Lakes, Minnesota <br />13604.006 <br />Remarks in bold are based on responses submitted by Metro Land Surveying & Engineering, dated <br />January 4, 2006, and the following submittals: <br />1. Midstates Tire and Tool, Inc. plan set prepared by Metro Land Surveying & Engineering, <br />dated January 4, 2006. <br />2. Existing and Proposed HydroCAD models prepared by Metro Land Surveying & Engineering, <br />dated January 5, 2006. <br />3. Proposed drainage plan prepared by Metro Land Surveying & Engineering, dated November <br />2, 2005. <br />• Drainage Review Comments: <br />1. Include off -site drainage entering the proposed pond via an existing culvert located under Jon <br />Avenue. Include this drainage in the hydrologic analysis of the site. <br />No further comment. <br />2. Use a curve number of 100 for the dead storage area of the wet pond and wetland in the HydroCAD <br />model. <br />No further comment. <br />3. The n value for the existing 24" culvert under 74th street should be increased to 0.024 for corrugated <br />metal pipe. <br />No further comment. <br />4. Define infiltration only above the normal water level for the proposed detention pond. <br />Set the infiltration invert elevation to 898.0 (NWL) for pond 2P. <br />5. Based on the infiltration guidance document prepared by RCWD, an infiltration rate of 0.25in/hr <br />(.0003472 ft/min) should be used for Type B soils. <br />An infiltration rate of 0.25 in /hr should be used for pond 2P. <br />6. Update the plans to reflect the sharp- crested vee weir defined in the HydroCAD model for Pond 2P <br />and Pond 3P. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.