My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-015 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-015 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2014 2:46:15 PM
Creation date
9/15/2014 3:50:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/13/2006
Council Meeting Type
Regular
Resolution #
06-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pomp's Tire, Inc. <br />Drainage Review <br />City of Lino Lakes, Minnesota <br />Page 2 January 23, 2006 <br />The grading plan indicates a broad crested weir outlet for the proposed infiltration basin which <br />is inconsistent with the sharp crested vee weir outlet defined in the HydroCAD model. Please <br />update the grading plan to reflect the model. <br />7. Include the sharp- crested vee weir detail in the plans as dimensioned in the proposed conditions <br />HydroCAD model for Pond 2P and Pond 3P. <br />Please include a detail of the sharp crested vee weir in the plans. <br />8. Include details of the pond outlet baffle and bale check in the plan. <br />No further comment. <br />9. The high water levels indicated in the grading plan is inconsistent with the high water levels <br />summarized in the HydroCAD model. Update the plan to reflect modeling results. <br />Update high water levels on the grading plan and pond baffle outlet detail according to the <br />above model revision results. <br />10. Expand the easement at the south corner of the proposed detention pond and add easement along <br />storm sewer from the cul -de -sac to the proposed detention pond. <br />No further comment. <br />11. Submit a copy of the RCWD 05 -117 permit, RCWD 04 -100 permit, and the NPDES permit. <br />No further comment. <br />Storm Sewer Review Comments: <br />12. Please submit storm sewer calculations and a storm sewer drainage map for review. <br />Storm Sewer design is typically accomplished using the rational method. Storm sewer for the <br />Pomp's Tire site was designed using HydroCAD. Pipe capacities were checked against <br />inflow values determined in the model, and there appears to be sufficient capacity to convey the <br />10 -year storm event. <br />13. Include roof drainage in the storm sewer design calculations. <br />No further comment. <br />14. Include rim and invert elevations for all catchbasins and manholes on the plan. <br />A minimum of 2 feet of cover from top of storm sewer pipe to rim of catch basin /manhole is <br />recommended. <br />Additional Comment <br />15. Should the 24" diameter storm sewer pipe between CBMH3 and CBMH2, as shown on the <br />Utility Plan, be 30" in diameter? <br />
The URL can be used to link to this page
Your browser does not support the video tag.