Laserfiche WebLink
Marshan Meadows <br /> Development Contract <br /> 3-13-2006 <br /> b) The Developer shall submit a turf establishment plan which details <br /> topsoil placement, seeding, sodding,mulching, fertilizing and <br /> watering. Said plan shall be approved by the City prior to the <br /> commencement of site grading or construction. <br /> 3. Grading and Erosion Control Construction&Maintenance <br /> a) Prior to the commencement of site grading and erosion control,the <br /> Developer shall complete items II.A.1 and H.A.2 as listed above. <br /> b) The Developer shall grade the site to within 0.2 foot of the grades <br /> shown on the approved grading plan.No deviations will be allowed <br /> unless a revised plan is submitted and approved by the City and all <br /> other regulatory agencies. <br /> c) All development shall conform to the natural limitations presented <br /> by the topography and soil of the subdivision in order to create the <br /> best potential for preventing soil erosion. <br /> d) Erosion and siltation control measures shall be coordinated with the <br /> different stages of development. The Developer shall attain an <br /> NPDES Stormwater Permit prior to engaging in any site grading <br /> activities. All terms and conditions of the NPDES permit must be <br /> adhered to by the Developer throughout construction the duration of <br /> construction of the Subdivision from start to finish. <br /> e) Where the topsoil is removed, sufficient arable soil shall be set aside <br /> for respreading over the developed area. The topsoil shall be <br /> restored to a depth of at least four(4)inches and shall be of a quality <br /> at least equal to the soil quality prior to development.The Developer <br /> shall make all necessary adjustments to the curb stops to bring them <br /> flush with the topsoil prior to occupancy. <br /> f j The Developer shall install four(4) inches of topsoil on all <br /> boulevards and seed or sod as approved by the City. The Developer <br /> shall make all necessary adjustments to the curb stops to bring them <br /> flush with the topsoil prior to occupancy. <br /> g) All disturbed areas shall be sodded or seeded, as designated per the <br /> approved plans, immediately upon completion of grading . <br /> h) All streets shall be protected from erosion deposits. This should <br /> include a combination of roadside silt fences, roadside sod strips, <br /> catch basin rock bale inlet protection,rock construction entrances, <br /> straw mulch, and/or street sweeping. <br /> Page 3 <br />