Laserfiche WebLink
Marshan Meadows <br /> Development Contract <br /> 3-13-2006 <br /> i) No soils shall be imported or exported without City approval. <br /> j) All site grading shall be performed in accordance with the <br /> requirements of the Rice Creek Watershed District. <br /> k) Existing wells and on-site septic systems shall be properly <br /> abandoned. <br /> 4. Final access drive and driveway grading, subbase, gravel base, bituminous <br /> binder course, and concrete curb and gutter shall be furnished and installed. <br /> 5. Sanitary sewer mains, laterals or extensions, including all necessary building <br /> services and other appurtenances shall be furnished and installed. All <br /> connections to existing City facilities shall be performed by the Developer, <br /> but only upon approval and authorization of the City of Lino Lakes at least <br /> 48 hours prior to making actual connection. <br /> 6. Water mains, laterals or extensions, including all necessary building <br /> services,hydrants,valves and other appurtenances shall be furnished and <br /> installed. All connections to existing City facilities shall be performed by <br /> the Developer,but only upon approval and authorization of the City of Lino <br /> Lakes at least 48 hours prior to making actual connection. <br /> 7. The Developer shall place iron monuments at all lot and block corners and at <br /> all other angle points on boundary lines. Iron monuments shall be placed <br /> after all street and lawn grading has been completed in order to preserve the <br /> lot markers for future property owners. Lot corner irons on the back <br /> property line shall be installed so that the top of the iron corresponds to the <br /> finished ground elevation in accordance with the approved grading plan- <br /> guard stakes shall be appropriately installed to mark these irons. <br /> 8. The Developer shall promptly clear dirt and debris, within public right-of- <br /> ways, and drainage and utility easements, resulting from construction by <br /> the Developer, its purchasers,builders and contractors within five (5) days <br /> after notification by the City. The Developer or its assigns shall be <br /> responsible for all necessary street and storm sewer maintenance including <br /> street sweeping, and storm sewer resulting from the accumulation of said <br /> dirt and debris, prior to issuance of any Certificates of Occupancy. <br /> Warning signs shall be placed when hazards develop in streets to prevent the <br /> public from traveling on same and directing attention to detours. If and <br /> when the streets become impassable, such streets shall be barricaded and <br /> closed. The Developer shall maintain a smooth,hard driving surface and <br /> adequate drainage on all temporary streets. <br /> page 4 <br />