My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-048 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-048 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:37:27 PM
Creation date
9/16/2014 11:13:10 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/13/2006
Council Meeting Type
Regular
Resolution #
06-048
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract—Site Grading Only <br /> Pine Glen <br /> March 13, 2006 <br /> completed and approved by the City Engineer, City Forester, and any <br /> other governing agency with jurisdiction as required. <br /> b) The Developer shall remove, dispose of, or treat all dead and <br /> diseased trees in accordance with the City Forester's <br /> recommendation before building permits will be issued. <br /> 4. Grading and Erosion Control Construction&Maintenance <br /> a) Prior to the commencement of site grading and erosion control, the <br /> Developer shall complete items II.A.I, II.A.2, and II.A.3 as listed <br /> above. <br /> b) The Developer shall grade the site to within 0.2 foot of the grades <br /> shown on the approved Grading plan. No deviations will be allowed <br /> unless a revised plan is submitted and approved by the City and all <br /> other regulatory agencies. <br /> c) All development shall conform to the natural limitations presented <br /> by the topography and soil of the subdivision in order to create the <br /> best potential for preventing soil erosion. <br /> d) Erosion and siltation control measures shall be coordinated with the <br /> different stages of development as applicable. Appropriate control <br /> measures as required by the City shall be installed prior to <br /> development when necessary to control erosion. <br /> e) Land shall be developed in increments of workable size such that <br /> adequate erosion and siltation controls can be provided as <br /> construction progresses. The smallest practical area of land shall be <br /> exposed at any one period of time. <br /> f) Where the topsoil is removed, sufficient arable soil shall be set aside <br /> for respreading over the developed area. The topsoil shall be <br /> restored to a depth of at least four(4) inches and shall be of a quality <br /> at least equal to the soil quality prior to development. <br /> g) The Developer shall install four (4) inches of topsoil on all <br /> boulevards and seed or sod as approved by the City. The Developer <br /> shall make all necessary adjustments to the curb stops to bring them <br /> flush with the topsoil prior to occupancy. <br /> h) All disturbed areas shall be seeded or sodded as designated per the <br /> plans. <br /> page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.