My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-048 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-048 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:37:27 PM
Creation date
9/16/2014 11:13:10 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/13/2006
Council Meeting Type
Regular
Resolution #
06-048
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract— Site Grading Only <br /> Pine Glen <br /> March 13, 2006 <br /> i) The street right-of-way, storm water storage ponds, and surface <br /> water drainage ways shall be graded prior to commencement of <br /> utility construction. <br /> j) Drainage swales, ditches, storm water storage ponds and other high <br /> risk erosion areas shall be protected from erosion. <br /> k) All remaining grading must be completed prior to issuance of <br /> building permits. <br /> 1) Protect streets from erosion deposits. This should include a <br /> combination of roadside silt fences, roadside sod strips, catch basin <br /> rock bale inlet protection, rock construction entrances, straw mulch, <br /> and/or street sweeping. <br /> m) The developer's engineer shall certify, in writing with an as-built <br /> survey, that all grading complies with the grading plan prior to <br /> issuance of building permits. <br /> n) A legal covenant shall be included within the homeowner's <br /> association documents prohibiting the use of phosphorus on lawns. <br /> o) The developer shall be responsible for ascertaining that site <br /> geotechnical and groundwater conditions are adequate and <br /> conforming with the grading and site improvements as proposed. <br /> 5. The Developer shall place iron monuments at all lot and block corners and at <br /> all other angle points on boundary lines. Iron monuments shall be placed <br /> after all street and lawn grading has been completed in order to preserve the <br /> lot markers for future property owners. Lot corner irons on the back <br /> property line shall be installed so that the top of the iron corresponds to the <br /> finished ground elevation in accordance with the approved grading plan- <br /> guard stakes shall be appropriately installed to mark these irons. <br /> 6. The Developer agrees to maintain, at all times before acceptance of the <br /> streets by the City, an access road suitable for use by emergency,police and <br /> fire department equipment. The adequacy of such road shall be the sole <br /> determination of the City. Furthermore, such access road shall be located no <br /> more than 150 feet from any structure built within the Subdivision. <br /> 7. The Developer shall promptly clear dirt and debris, within public right-of- <br /> ways, and drainage and utility easements, resulting from construction by <br /> the Developer, its purchasers, builders and contractors within five (5) days <br /> after notification by the City. The Developer or its assigns shall be <br /> responsible for all necessary street and storm sewer maintenance including <br /> street sweeping, storm sewer cleaning, ditch cleaning and pond dredging, <br /> page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.