My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-092 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-092 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2014 12:44:13 PM
Creation date
9/17/2014 9:06:02 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
06/12/2006
Council Meeting Type
Regular
Resolution #
06-092
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR. 20.2006 12:17PM INFRATECH 7634286489 <br />• April 20, 2006 <br />Mr. Tim ilillesheim <br />City of Lino Lakes Public Works <br />1189 Main Street <br />Lino Lakes, MN 55014 <br />NO. 906 <br />Infratech <br />Infrastructure Ti <br />21040 t <br />Rc <br />www <br />Phone 763 /428 -648 <br />ichnologies, Inc. <br />:ommerce Boulevard <br />gers, MN 55374-9341 <br />irifratechcatalog. coin <br />3 • Fax 763 /428 -6489 <br />RE: 54" x 36" ARCS PIPE JOINT SEALING <br />Dear Mr. Hillesheim, <br />Please review the following proposal and don't hesitate to call if you have any quest ons. <br />Our proposal is as follows{ <br />Cleaning <br />Infratech will clean the 54" x 36" arch pipe with use of our Guzzler high volume suc lion <br />equipment (we can also use our Jet /Vac equipment if applicable). The outfall area w 11 <br />need to be pumped down and if applicable balled off. <br />These service will be provided ® $210.00/hour, <br />Plus appropriate dump charges — if applicable <br />We estimate this cleaning to take approximately 1— 2 days. This will include the <br />Guzzler, the suction hose trailer and appropriate personnel. <br />Joint Sealing <br />Infratech will provide joint sealing services with Sauereisens elastomeric fiber reinfi reed <br />asphalt modified urethane gasket seal, NQ -F88. These services will include appropr ate <br />surface preparation and application services. <br />These services will be provided ® $989.00fioi t <br />Thanks Tim. Let me know if you have any questions. <br />Herbert Selvog <br />President <br />Infratech <br />JHs.zx42ao6 <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.