Laserfiche WebLink
• <br />• <br />AGENDA ITEM 6E <br />STAFF ORIGINATOR: Jim Studenski, City Engineer <br />COUNCIL MEETING DATE: June 12, 2006 <br />TOPIC: Resolution No. 06 - 94, East Rondeau Lake <br />Road Storm Sewer Repair <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />On June 1, 2006 city staff was notified that the culvert that conveys flow from <br />Rondeau Lake easterly to Hardwood Creek (under East Rondeau Lake Road) <br />had failed. The failure was caused by an old metal culvert rotting away. This <br />culvert is located north of 8166 East Rondeau Lake Road. City staff has <br />provided temporary repairs to the culvert and roadway to reopen the road until <br />permanent repairs are made. <br />Because of the large and continual flow of water, the existing metal pipe will be <br />replaced by a gasketed reinforced concrete dome style pipe 53" in diameter at <br />the base and 34" diameter at the top. <br />Estimated costs for this project amount to $17,000. There are no funds <br />budgeted or available for this extensive of a repair project within the Public <br />Services Budget. In the absence of any general fund contingency, the only <br />funding option available is the City's Surface Water Management Fund. <br />RECOMMENDATION: <br />Staff recommends that Resolution Number 06 - 94 be adopted. <br />