Laserfiche WebLink
• <br /> The ACHD Engineering Plan Review Process will apply to this site plan. Calculations must be <br /> provided along with a grading and erosion control plan that delineates the drainage areas for this site. <br /> The post-development rate/volume of runoff must not exceed the pre-developed rate/volume of runoff <br /> for the 10-year, critical design storm. An engineering plan review fee estimated at$500.00 will apply <br /> for this development. Contact Brett Voth, Engineer III (email: Brett.Voth@co.anoka.mn.us ; phone: <br /> 763.862.4263),should you have any questions regarding the ACHD Engineering Plan Review Process <br /> for this site. <br /> Following completion of the ACHD Engineering Plan Review Process,the ACHD Permit Process can <br /> begin. Two Access Permits (Commercial Access Permits =$250/each = $500.00 fee) and two ROW <br /> Permits(ROW Permits=$150/each= $300.00 fee)will be required and must be obtained prior to the <br /> commencement of any construction. Contact Terri Vaughan, Permit Technician, (email: <br /> Terri.Vaughan@co.an.oka.mn.us ; phone: 763.862.4239) for further information regarding the permit <br /> process,or view the information online at: littp://ww2.anokacoum.us/v3,.us/v3_hiahway//permits.asox. <br /> Thank you for the opportunity to comment. Feel free to contact me if you have any questions regarding <br /> this review. <br /> • <br /> Sincerely, <br /> Jane K.Rose <br /> Traffic Engineering Manager <br /> xc: File: CSAH 14+CSAH 23/Plats+Developments/2012 <br /> Curt Kobilaresik,Engineering Program Manager <br /> Larry Hoium,County Surveyor <br /> Randy Bettinger,Traffic Engineering Coordinator <br /> Josie Scott,Traffic Engineering Technician <br /> Terri Vaughan,Permit Technician <br /> Brett Voth,Engineer III <br />