My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-132 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-132 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2014 11:52:03 AM
Creation date
9/25/2014 11:40:19 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
12/10/2012
Council Meeting Type
Regular
Resolution #
12-132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />41 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$10.00 <br />35 <br />35 <br />0 <br />$350.00 <br />42 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$7.00 <br />60 <br />60 <br />0 <br />$420.00 <br />43 <br />2501.511 <br />18" RC PIPE CULVERT CLASS III <br />LIN FT <br />$57.00 <br />70 <br />70 <br />6 <br />$3,990.00 <br />44 <br />2501.515 <br />18" RC PIPE APRON WITH TRASH GUARD <br />EACH <br />$2,760.00 <br />2 <br />2 <br />0 <br />$5,520.00 <br />45 <br />2550.604 <br />PATCH <br />SQ YD <br />$69.00 <br />35 <br />35 <br />0 <br />$2,415.00 <br />46 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$700.00 <br />1 <br />1 <br />0 <br />$700.00 <br />47 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$4,000.00 <br />0.1 <br />0.1 <br />0 <br />$400.00 <br />48 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />$5.00 <br />20 <br />20 <br />0 <br />$100.00 <br />49 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$11.00 <br />60 <br />60 <br />0 <br />$660.00 <br />Totals For Section Area 6 - Joyer Lane: <br />$22,015.00 <br />Area 7 Lois Lane and Greenwood Lane <br />50 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$500.00 <br />1 <br />1 <br />0 <br />$500.00 <br />51 <br />2101.511 <br />CLEARING AND GRUBBING <br />LUMP SUM <br />$1,800.00 <br />1 <br />1 <br />0 <br />$1 ,800.00 <br />52 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />$39.00 <br />20 <br />20 <br />0 <br />$780.00 <br />53 <br />2105.601 <br />SITE GRADING <br />LUMP SUM <br />$2,130.00 <br />2 <br />2 <br />0 <br />$4,260.00 <br />54 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$4,000.00 <br />0.1 <br />0.1 <br />0 <br />$400.00 <br />55 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />$5.00 <br />20 <br />20 <br />0 <br />$100.00 <br />56 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$5.00 <br />500 <br />500 <br />0 <br />$2,500.00 <br />Totals For Section Area 7 - Lois Lane and Greenwood Lane: <br />$10,340.00 <br />Area 8 - 974 Aspen Lane <br />57 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$750.00 <br />1 <br />1 <br />0 <br />$750.00 <br />58 <br />2104.602 <br />SALVAGE AND INSTALL 15" RC APRON <br />EACH <br />81,850.00 <br />1 <br />1 <br />0 <br />$1,850.00 <br />59 <br />2105.523 <br />COMMON BORROW <br />CU YD <br />$35.00 <br />15 <br />15 <br />0 <br />$525.00 <br />60 <br />2433.507 <br />REMOVE RETAINING WALL <br />LUMP SUM <br />$525.00 <br />1 <br />1 <br />0 <br />$525.00 <br />61 <br />2501.602 <br />SKIMMER <br />EACH <br />$1,740.00 <br />1 <br />1 <br />0 <br />$1,740.00 <br />62 <br />2503.541 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,610.00 <br />1 <br />1 <br />0 <br />$1,610.00 <br />63 <br />2503.541 <br />15" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />$53.00 <br />16 <br />16 <br />0 <br />$848.00 <br />64 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />$5.00 <br />20 <br />20 <br />20 <br />$100.00 <br />65 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$4,000.00 <br />0.1 <br />0.1 <br />0.1 <br />$400.00 <br />66 <br />2575.505 <br />SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.) <br />SQ YD <br />$11.00 <br />50 <br />50 <br />0 <br />$550.00 <br />67 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$11.00 <br />50 <br />50 <br />0 <br />$550.00 <br />Totals For Section Area 8 - 974 Aspen Lane: <br />59,448.00 <br />Area 9 - Sargant Court and Ash Street <br />68 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$500.00 <br />1 <br />1 <br />0 <br />$500.00 <br />69 <br />2104.602 <br />SALVAGE AND REINSTALL CONCRETE APRON <br />EACH <br />$3,400.00 <br />1 <br />1 <br />0 <br />$3,400.00 <br />70 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$4,500.00 <br />0.05 <br />0.05 <br />0 <br />$225.00 <br />71 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />$5.00 <br />10 <br />10 <br />0 <br />$50.00 <br />72 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$11.00 <br />50 <br />50 <br />0 <br />$550.00 <br />Totals For Section Area 9 Sargant Court and Ash Street: <br />$4,725.00 <br />Change Order 1 <br />73 <br />2105.607 <br />POND EXCAVATION <br />CU YD <br />$21.00 <br />42 <br />42 <br />42 <br />8882.00 <br />74 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$4,000.00 <br />0.2 <br />0.2 <br />0.2 <br />$800.00 <br />75 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />$5.00 <br />40 <br />40 <br />40 <br />$200.00 <br />76 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SO YD <br />$4.00 <br />1100 <br />1100 <br />1100 <br />$4,400.00 <br />77 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$15.00 <br />80 <br />80 <br />80 <br />$1,200.00 <br />78 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$10.00 <br />5 <br />5 <br />5 <br />$50.00 <br />79 <br />2550.604 <br />PATCH <br />SQ YD <br />$69.00 <br />5 <br />5 <br />5 <br />$345.00 <br />80 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$50.00 <br />50 <br />50 <br />50 <br />$2,500.00 <br />81 <br />2503.541 <br />15" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />$53.00 <br />8 <br />8 <br />8 <br />$424.00 <br />82 <br />2575.505 <br />SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.) <br />SQ YD <br />$11.00 <br />40 <br />40 <br />40 <br />$440.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.